If you work as a contractor, your client may ask you for the same number every month: the man hours worked by your crews on its site. If you keep OSHA injury and illness records, you also need it at year end for Form 300A. It looks simple. However, if you calculate it differently each month or mix up crews, your incidence rates stop being comparable.

This guide covers what man hours worked are, how to calculate them with a full example and which hours OSHA counts. You will also see which rates use them, how contractor hours work and which mistakes to avoid when you add them up.

What are man hours worked?

Man hours worked are the sum of the hours that every person in a group actually worked during a period. The group can be a company, an establishment, a site, a contract or a crew. OSHA calls this figure "total hours worked" on Form 300A, and BLS calls it employee hours worked. In safety, man hours are the denominator of incidence rates such as TRIR and DART.

The idea is to measure exposure. One injury on a crew of 20 does not weigh the same as one injury on a site with 500 workers. So when you divide by hours worked, the rate shows how often cases happen for a fixed amount of work, whatever the size of the team.

How to calculate man hours worked

The base formula is a sum: the hours each person worked in the period. In practice, you start from headcount and the schedule, and then adjust. These are the steps:

  1. Multiply the number of employees by the hours per shift and by the scheduled workdays in the period.
  2. Subtract the scheduled hours not worked: vacation, sick leave, holidays and any other absence, paid or unpaid.
  3. Add the overtime hours actually worked.
  4. Repeat the calculation for each crew or site, and then add the results without counting the same hours twice.

As a formula: man hours worked = (employees × hours per shift × scheduled workdays) − hours not worked (paid or unpaid) + overtime.

Example: a crew of 40 on a 40-hour week

Take a contract with 40 employees on 8-hour shifts, 5 days a week. The month has 22 workdays, and one of them is a paid holiday when the whole crew is off. During the month the crew worked 360 overtime hours. Also, 3 employees took 5 days of vacation and 2 employees were out sick for 3 days.

ItemCalculationHours
Scheduled hours40 employees × 8 hours × 22 workdays7,040
Paid holiday40 employees × 8 hours × 1 day− 320
Vacation3 employees × 5 days × 8 hours− 120
Sick leave2 employees × 3 days × 8 hours− 48
OvertimeLogged in the month+ 360
Man hours worked6,912

If the crew had 1 recordable case that month, the monthly rate would be 1 × 200,000 / 6,912 = 28.94. With so few hours, a single case pushes the rate very high. That is why it helps to report the year-to-date figure as well.

What OSHA counts as total hours worked

For OSHA recordkeeping, the references are OSHA FAQ 32-1 and the worksheet in the OSHA recordkeeping forms package. Both say to include the hours of salaried, hourly, part-time and seasonal workers, plus workers you supervise day to day, such as temp help. They also say not to include vacation, sick leave, holidays or other non-work time, even if employees were paid for it.

Type of hoursCount it?Note
Regular hours actually workedYesThe base of the calculation
OvertimeYesThe Form 300A worksheet adds overtime hours
Salaried, hourly, part-time and seasonal employeesYesListed in OSHA FAQ 32-1
Temporary workers you supervise day to dayYesFor example, workers from a temporary help service
Vacation, sick leave and paid holidaysNoExcluded even if paid
Salaried or commission employees without time recordsEstimateBLS allows scheduled hours or 8 hours per workday
Training, safety meetings and travel inside the siteYes, if during working timeOSHA excludes only non-work time. If these happen during working time, count them, and apply the same rule every month

If your payroll only shows hours paid, OSHA says you must estimate the hours actually worked. For salaried or commission employees, the Bureau of Labor Statistics allows estimates based on scheduled hours or 8 hours per workday. Above all, apply the same rule every month and on every crew. If the rule changes, the rate changes even though safety did not.

Total hours worked on OSHA Form 300A

Employers that must keep OSHA injury and illness records also need man hours at year end. Under 29 CFR 1904.32, the annual summary must include the annual average number of employees and the total hours worked by all employees covered by the OSHA 300 Log. A company executive certifies the summary. Then it is posted no later than February 1 of the following year and kept up until April 30.

If you do not have the exact number, the Form 300A package includes an optional worksheet. First, you multiply the number of full-time employees by the hours a full-time employee works in a year. Then you add overtime and the hours of part-time, temporary and seasonal workers, and round up to the next whole number.

Example: annual total for a contractor with 40 employees

ItemCalculationHours
Scheduled hours per full-time employee52 weeks × 40 hours2,080
Vacation2 weeks × 40 hours− 80
Paid holidays8 days × 8 hours− 64
Sick leave (average per employee)3 days × 8 hours− 24
Hours actually worked per full-time employee1,912
Full-time hours40 employees × 1,912 hours76,480
OvertimeLogged in the year+ 3,520
Temporary workers you supervise day to day2 workers × 1,000 hours+ 2,000
Total hours worked82,000

Some establishments must also submit their Form 300A data to OSHA electronically by March 2 of the following year. Under 29 CFR 1904.41, that applies to establishments that must keep records and had 250 or more employees at any time during the previous year, and to those with 20 to 249 employees in certain listed industries.

Incidence rates that use man hours: TRIR and DART

In the US, the standard base is 200,000 hours. According to OSHA and BLS, it represents 100 employees working 40 hours per week, 50 weeks per year. So the rate reads as cases per 100 full-time workers.

RateFormulaSource
Total recordable case rate (commonly called TRIR)Recordable injuries and illnesses × 200,000 / total hours workedOSHA forms package and BLS
DART rateCases with days away, restricted work or job transfer (columns H + I of the OSHA 300 Log) × 200,000 / total hours workedOSHA forms package
ILO frequency rate (international reference)New cases of occupational injury × 1,000,000 / hours workedILO resolution, 16th ICLS (1998), para. 19

With the 82,000 hours of the annual example, 2 recordable cases give a TRIR of 2 × 200,000 / 82,000 = 4.88. If 1 of those cases involved days away from work, the DART rate is 1 × 200,000 / 82,000 = 2.44.

The ILO, by contrast, uses a base of 1,000,000 hours in its resolution on occupational injury statistics, and other countries set their own bases. On a base of 1,000,000 hours, the same 2 cases would read 24.39. Therefore, never compare rates on different bases directly. Each standard also counts different cases in the numerator. For more on these metrics, see key metrics to track inspections, which covers TRIR and LTIFR. And for the broader picture, see occupational health and safety indicators.

Man hours for contractors and the report to your client

When a contractor reports to a host company, man hours worked are part of that safety report. Together with recordable cases and days away, they let the client see the safety performance of everyone working on its site.

Under 29 CFR 1904.31, who records a case depends on who supervises the worker day to day:

  • Your own crews: if your employees work on a client's site under your day-to-day supervision, you record their cases on your OSHA 300 Log.
  • Workers the client supervises: if the host company supervises a contractor's employees day to day, the host records their cases.
  • Temporary workers: the employer that supervises them day to day records their cases, even if they are not on its payroll.
  • One record per case: the companies involved should coordinate so that each injury or illness is recorded only once.

Hours follow the same logic. The Form 300A worksheet counts the hours of workers subject to day-to-day supervision by your establishment, which is the same test used to record cases. The ILO resolution makes the same point: the numerator and the denominator should have the same coverage. So if a worker's cases go on your log, that worker's hours go into your total.

In practice, the report works best when you always deliver the same data: man hours worked by site and by month, recordable cases, DART cases and year-to-date totals. Also, agree at the start of the contract on which hours count, which base the rates use and the delivery date.

Common mistakes when you add up man hours

  • Counting the same person twice. It happens when a worker moves between crews or sites in the same month. Each hour counts once, where it was worked.
  • Using scheduled hours instead of hours worked. In the annual example, scheduled hours would give 88,720 hours and a TRIR of 4.51 instead of 4.88. So the rate looks better than it is.
  • Leaving out temporary or contract workers you supervise. If their cases go on your log, their hours go in your total.
  • Changing the rule mid-year. For example, you start counting training hours in July. Then the months stop being comparable.
  • Comparing rates with different bases. A rate per 200,000 hours is not comparable with one per 1,000,000 hours, and the cases counted can differ too.
  • Adding everything up at the last minute. When each supervisor sends hours in a different format on the last day of the month, errors show up when there is no time to fix them.

How to keep man hours records with DataScope

DataScope is the field operations platform for maintenance, field operations and EHS. With it, each supervisor submits the crew's hours from the mobile app, even with no signal: headcount, shift hours, overtime and time off for the period. Answers stay on the phone and sync once the connection is back and the app is opened.

You can set up the form with calculations and validations, for example validations on number questions. That way, every crew reports with the same rule.

On paid plans, you can export the data to Excel or send it to Google Sheets to build the monthly report. From the Professional plan, you can also connect it to Power BI through the API. So the totals for your client come from a single source. You can see how this connects with the rest of safety management on the safety page.

One clarification: this record supports your safety reporting. It is not a timekeeping or attendance system.

Paid plans include unlimited users, and you pay by credits, not by user. That means you can add every crew supervisor without paying for each new user.

If you want to try it, start with one contract. Build the form with your crews, have supervisors fill it in every week and compare the monthly total with the way you calculate it today. You can create a free account, with no expiration date, to build your first form. The Free plan allows up to 10 users, has a limit on forms and monthly credits, and does not include Excel export or integrations.

Man hours worked look like an administrative number, but they hold up every rate used to measure safety on a contract. Calculate them the same way every month, separate sites and crews without counting anyone twice, and know which base your client uses. Then every month you report a number that can be compared.

Frequently asked questions

What are man hours worked?

Man hours worked are the total hours that all the people in a group actually worked during a period. The group can be a company, a site, a contract or a crew. For example, 10 people who work 8 hours a day for 20 days add up to 1,600 man hours worked.

How do you calculate total hours worked for OSHA?

Add the hours actually worked by salaried, hourly, part-time and seasonal employees, plus temporary workers you supervise day to day. Include overtime. Leave out vacation, sick leave, holidays and other non-work time, even if paid. If you only track hours paid, OSHA says you must estimate the hours actually worked.

Does overtime count toward man hours worked?

Yes. Overtime hours are hours actually worked, so they go into the total. The optional worksheet that comes with OSHA Form 300A tells you to add overtime hours to full-time hours. The ILO also says the ideal denominator is the hours actually worked by the group.

Do vacation, sick leave and holidays count?

No. OSHA says not to include vacation, sick leave, holidays or any other non-work time, even if employees were paid for it. BLS gives the same rule for incidence rates. So subtract all time off, paid or unpaid, from scheduled hours before you add up the total.

Who counts the hours of contractors and temporary workers?

It depends on who supervises them day to day. Under 29 CFR 1904.31, that employer records their injuries and illnesses, and each case is recorded only once. The Form 300A worksheet uses the same test for hours. So the hours go wherever the cases go.

Why do incidence rates use 200,000 hours?

It is the standard base in the US. It equals 100 employees working 40 hours a week, 50 weeks a year. So a TRIR reads as cases per 100 full-time workers. The ILO uses 1,000,000 hours instead, so rates on different bases are not comparable.