Templates General Sellen project weekly safety inspection form checklist Sellen project weekly safety inspection form checklist Weekly project safety inspections What does this form include? This form contains 25 sections: HousekeepingSite Neat/Clean/OrderlyNothing Hits The Deck In PlaceMaterial on Carts enforcedMaterial staged properlyTrash & Debris ManagedNo Hazardous Waste on-site Public / Pedestrian ControlsDesignated public access waysSignage in place & effectiveBarricades/Fencing as req.Flaggers/Spotters as req.No trip/other hazards presentAll work/material inside zone AccessDesignated access ways providedAccess signage in place & effectiveAccess free of trip or other hazardsStair rails @ 30" in height or 4 risersStairs when elevation changes > 19"Ramps at least 18" wide & secured LightingPassageways/access well litTask lighting as neededLighting covers/guards in place & single power sourceCords grounded - GFCI'sEmergency lighting in place PPEPPE use per site plan/AHAHigh Vis outerwear in useRespirators used as req.Hearing protection used as req.100% Safety glasses in useGloves used as required ElectricalCord management in placeCords protected from damage100% GFCI protection in placeLOTO procedures as requiredEnergized panels have covers & breakers are labeled? Fire ControlSufficient Fire Extinguishers on site & in working order/inspectedEmergency exit routes establishedCombustible debris removed dailyFlammables in metal cans & stored in Flame Locker when not in use ToolsGrinders have guards in placePortable & table saws guardedPneumatic tool hoses securedProper tool for job being usedCompressed gas cylinders secured upright with caps LaddersCorrect type/size usedLadders secured as requiredStep ladders used safetyExt ladders safely used3 or > rungs above for accessJobsite built ladder per code Fall ProtectionAll working/walking surfaces guarded/protected above 4'All other fall hazards above 4' controlled or guardedAll fall protection gear properly used by trained employeesWall openings/holes covered or guardedGuardrails (42" +/- 3") with mid rail - toe boards in place?Cable guardrails are taught with less than 3" deflection? EnvironmentalAir quality/dust issues controlledNo Health Hazard 3 or > material on siteNoise exposure controlled/acceptable levelNo run off from site present to public areasApplicable number/type of spill kits availableWork adjacent to occupied space evaluated Aerial LiftsQualified operators onlyLifts inspected prior to useGates/chains closed when in useNo standing/climbing on railsScissor lift used on flat/level surfaceFall protection used in boom lifts ForkliftsQualified operators only - documented trainingInspected daily with documented inspectionForklift and attachments used properly per designNo loads rigged under forks or to mastLoads properly secured/carriedOperator demonstrates safe operating skills CranesQualified operators only - documented certsCranes certification verifiedInspected daily - inspection log maintainedAll operational hazards identified/controlledQualified riggers assigned - rigging inspectedCritical lift/Pre-lifts meeting when required Work PlatformsPlatforms fully planked (min 36")Safe access to platforms in place100% guardrails including end returnsControl zones/falling object protectionPlatform fully supported/correctly installedFall protection for assembly/disassembly Trenching / ExcavationsCave in protection system/design when >4' deepSoil spoils are greater than 2' from the excavationInspected daily when workers in trench/excavSafe access provided - ladders every 25 feetFall protection/control zones when >6 feet deepStanding water/other hazards control ScaffoldsScaffolding erected per manufacturers designSafe access on/off scaffoldsQualified scaffold users/erectorsDaily inspections performed/logs maintainedControl zones under scaffolding as requiredGuardrails in place on scaffolding above 4' Confined SpacePermit required/issued/checkedAir monitoring required/in placeRescue equipment/plan in placeLighting/Ventilation establishedAll space entrants have harnesses on Demolition WorkDust/environment conditions controlledNo unidentified/suspect hazardous materialIdentify energized/no-demo conduits and pipingPPE - cut resistant gloves/sleeves usedDebris control/removal means in place Hot WorkCity/jurisdiction permit current/on fileSellen Burn Permit issued/signedFire watch protocols established/in placeAreas of hot work/spark travel inspectedGas cylinders/torches properly used/secured Company: Add media Add signature Send copy of completed inspections to the Safety Department and maintain copies on file at project si Similar templates Manufacturing 5s audit Tractor maintenance age checklist Construction risk assessment template checklist Affinity insurance services pl farm insurance survey checklist Cleaning audit Manufacturing 5s audit Use this template