Kdec solar service report checklist
Solar service report v3
What does this form include?
This form contains 18 sections:
ROOF TOP INSPECTION
- Visually inspected each solar module
- Wash solar array thoroughly
- Check mounting hardware is still secure
- Check external wiring supports
- Check the integrity of the earthing system
- Check DC isolators for water ingress
- Check DC isolators for correct operation
- Check all connectors are engaged correctly
- Check labelling is still legible and correct
GROUND LEVEL INSPECTION
- Inverter has been cleaned
- Inverter screen is still legible
- Check electrical wiring supports are still secure and intact
- Check operation of DC isolators
- Check connectors are engaged properly
How long does the Inverter take to disconnect ( < 2sec)
How long does the Inverter take to reconnect ( > 60sec)
ANTI ISLANDING TEST
- Does the system pass the Anti Islanding test
String Test Results
SYSTEM TEST
Irradiance at time of testing
String measured Voc
String measured Isc
String 1 Vmp
String 1 Imp
Inverters Yearly Production Output
Inverters Lifetime Output
Repairs urgently needed
Repairs suggested
Overall comments on system service
Technician signature