Shift handover sheet - duplicate - duplicate - duplicate checklist
इस फ़ॉर्म में क्या शामिल है?
इस फ़ॉर्म में 16 अनुभाग हैं:
Date Date
Current Shift Information
Shift Engineer
Add New Plant Failure
Description
Plant Failures
- Repaired {If no add detail of works required}
Add New PPM or Reactive Job
Daily Work Log - Start and Finish Times to be Recorded for all Entries
Checks
- Plant Walk-round completed {Days}
- BMS checks carried out
- LONDON FDSK QUEUE CHECKED.
- HAVE ALL CRITICAL FDSK'S BEEN UPDATED?
- 30 MIN LIGHTING WALK-ROUND
Handover Information
- Shift Handover carried out
Information to be Passed to Next Shift or Other Requests from Bloomberg/Security
Engineer Finishing Shift
Engineer Starting Shift, Keys and Blackberry Recieved
Lower ground floor training rooms temperature checks
- Average temp room 1
- Average temp room 2
- Average temp room 3
- Average temp room 4
CHILLED WATER TEMPS
- CITY GATE HOUSE CHILLED WATER FLOW TEMP
- 50 FINSBURY CHILLED WATER FLOW TEMP
- 38 FINSBURY CHILLED WATER FLOW TEMP
BOILER TEMPS
- CITY GATE HOUSE LANDLORDS BOILER IS THE TEMP ABOVE 50C? HAS THE COMPENSATED HEATING REACHED SET POINT?
- CITY GATE HOUSE BOILER FLOW TEMPIS THE TEMP ABOVE 50C?
इस टेम्पलेट का उपयोग करें