Morgan group hotel - room inspection checklist
Template to be completed for the close out of hotel rooms and to document relevant findings upon inspection.
מה כולל טופס זה?
טופס זה מכיל 9 חלקים:
This document is only to be used internally for the close out of Morgan Group Hotels.When completing
Entrance to Room
- Glass floor room number
- Carpet fitting around door no.
- New handle/lock
- Door seal drop
- Door closing mechanism/"soft"
- Door latch
- Light switch at door entrance
- Door decorations
- Door stop
- Is mirror fixed to the wall (and in correct position)
- Shaving socket
- Gold curtains installed and operational
Bedroom
- Switch for bathroom lighting
- Gold curtain switch
- Sprinkler head (clean of decs)
- Decoration of main wall
- Power sockets and light switches
- Media hub
- Tchin tchin chair
- Grills, present and clips secure
- Dimming switch / Ching Ching chair
- Led lights above windows (clean from decs)
- Black out blinds/Venetian blinds
- Pendant lamp above table
- Table
- Chair and table
- Sofa
- Carpet rug
- Middle cabinet
- Minibar cabinet
- Minibar fridge
- Safe (fitted and secure)
- Decoration around windows
- Decoration of wall near bed
- 2 sockets at bed end
- Media charger beside bed
- Bed side table lamps
- New bed frame and header board
- Telephone present and operational
- TV installed and operational (checking AV connections)
Bathroom
- Limestone floor
- Grouting between tiles
- Hanging pendant light
- Vanity top
- Basin and plug
- Bathroom net curtains
- Mirror
- Bathroom ceiling fittings
- Shower/WC
- Bath tub
General
- Ceiling painting
- Additional Furniture
- Check underside of drawers fully decorated
- Mastic/silicone finishes
- Curtain tracks and brackets
- TV sync