Cat & genny checklist
Assessment
¿Qué incluye este formulario?
Este formulario contiene 11 secciones:
Start of Survey
- Task 1: Pre-operational Checks: Check Batteries, Switch on, GPS Located on, Test Location Tool & Generator, Inspect for Damage / Serviceability
Add media
Task 7: Demonstrated Direct Connection
End of Search
- Task 11: Inspect all equipment used for defects, clean equipment, store equipment away correctly, report defects & replacement of batteries required to site team
Type of Cable Avoidance Tool Used:
Underground Apparatus: The following underground apparatus was detected during the practical assessment.
Scheduled Action Plan:
Comments:
Auditors Signature
Trainees Signature
Usar esta plantilla