Swing gate preventative maintenance visits checklist
V1.0
What does this form include?
This form contains 48 sections:
Risk assessments and method statements must be carried on all sites to ensure that the risk of injury
Gates
- Number of gates on system
- Number of parking spaces being controlled
Gate location (1)
Gate direction
Take a photo of gate from entrance side of gate
Manufacturer
Model
Standard Preventative Maintenance
- Loops fitted
- IR beams fitted
- Warning lights fitted
- Safety Edges fitted
Signs fitted
Length of gate (mm)
Operating Equipment
Gate location (2)
Additional Gates
General
- Installation checked for squareness and levels ok?
- Motors and operation of each item of installed equipment tested. Any evident visible or audible contra-indications?
- Inspect and sweep out any debris from motor pits and rail gullies. Is there flooding or excessive build up of debris?
Location of the mains isolator
Safety Edges
- Visually inspect each component for splitting or puncturing of the rubber or degeneration of the supply tubing, welding joints or other defect that could compromise safety by affecting the efficiency of the system?
Swing Gate
- Is the condition of the gate controller housing ok?
- Inspect general condition of hinges, gate stops, safety edges, photocells, reflectors and enclosure and clean if required - OK?
- Check hinge alignment - OK?
- Check limit actuators against closing / opening positions of gate and adjust as necessary - all OK?
- Scan pivot hinge alignment by taking line of sight. Report any variation or damage - OK?
- Check security of motor fixing bolts and base plate. Report any deterioration of concrete base(s) - OK?
- Check slow down efficiency at each end of travel, checking gate does not slam - OK?
- Check gate hinges for wear. Report if unduly worn - OK?
Key Type
Key Number
Check safety systems are compliant, shared pedestrian use, internal key pad, Push to exit bars, Break
Report on any required works
- System complies with EN SAFETY regulations Machinery Directive 2006/42/EC
Electrical certificate available for barrier and in date
Does electrical installation appear sound, safe and in reasonable condition
Source off power
Breaker size
Cable type
Cable size
Electrical Check
- Correct containment used
- Spur for barrier / gate in waterproof containment
- All wiring at barrier / gate checked for loose or badly made connections
Additional Information
Identify (if relevant) potential hazards at points labelled on diagram, and comment below
Include Diagram from library
A - impact / crushing on the leading edge of the closing
B - impact / crushing in the opening area
C - impact in the closing area
D - crushing of the hands on the hinge side edge
E - conveying feet on the bottom edge of the gate
F - conveyance of hands on drive group
G - conveying, hook and shear due to the modelling of the mobile leaf
Comments
Force Testing - at time of installation or refurbishment / safety upgrade undertake full Force Testin
Force Dynamics Testing BS EN 12445
- Is force testing required on this visit?
- Review photograph plans etc for alteration since previous visits - have conditions changed since last service visit?
Any additional comments
Any additional photos
Defects (list defects that need attention)
Recommendations (list items you would recommend)
Engineer
Client representative (if available)
As the person in control of the gate, you have a legal duty of care to users and visitors to the prem