Site acceptance test checklist
This site acceptance test (sat) checklist is used for the process of validating the reliability of newly manufactured equipment with other interfaces at the site. after the factory acceptance test, equipment delivery and site installation, the client follows a site acceptance test checklist ideally with the quality manager from the manufacturing facility. use this checklist as a guideline in conducting site acceptance tests and automatically generate a shareable report the moment you finish the sat.
What does this form include?
This form contains 4 sections:
Site Acceptance Test (SAT)
- Finishing visual check
- Main components visual check
- Internal box pressure and ventilation setting
- Utilities functionality and setting check
- Functionality/Interlocks Verification (Mechanical & Software)
- Hot test for dispensing systems
- Dose calibrator verification
- Safety devices and interlocks check
- Operator’s training
- Delivery of the performed FAT protocol and documentation package
Additional observations
The equipment has been delivered, installed and worked successfully.
Full Name and Signature of Company Representative
Use this template