Sat :: rope access risk assessment and method statement (rams) form checklist
Viptm form to be completed by vip::Sat::Dat engineer before starting a sat::Dat job type
What does this form include?
This form contains 21 sections:
Job Number
Job Type
Select date Date
Engineers on site
Is this a true SAT job?
If it is not SAT it is...
- If it is not SAT it is...
Access to hight will be by:
The following information constitutes an on-site risk assessment for the job. A Method Statement is also required.
- Via Velux window or rooflight
Sky SAT procedures with roped access techniques in use.
- Ladder.
With minimum control measures ( sky's fall arrest systems, eye bolting ML and LM or equivalent from the Ladder Hierarchy.
- Via dormer
Sky SAT procedures as trained with roped access techniques in use.
- Other means ( give details below )
Specify minimum control measures required.
Additions to or variations from standard control measures. Any other relevant information- Please specify clearly.
Which (if any) ladders are to be used? Select all required. NOTE: All PPE and ladder hierarchy should
If LM or ML cannot be used, state what alternative is to be used. An eyebolt or other attachment point must be used for all dish installs and all service work.
If anchor points are needed for Roped Access are they:
Can the following Hazards identified be removed. If hazard is not present select N/A
On-site identified hazards.
- Adverse weather
- Third parties
- Existing equipment
- Garden Hazards
- Ground Hazards
- Any other Hazard ( give details below)
Additional Hazard information
If Hazards cannot be controlled or minimised then they must be escalated (give details below)
A clear and detailed method for carrying out the work must be recorded here before the work commences. Items to be covered include site details, pre job preparation, roof type (flat/sloping(give apps angles)); rescue considerations (if standard rescue techniques say so, otherwise specify in detail). The method statement should have sufficient detail to allow another SAT team to understand how they would carry out the work. Add photos/draw diagrams as necessary to illustrate.
Add media
Both engineers must sign before work commences.
SAT Engineer 1
SAT Engineer 2