Quality inspection report checklist
Nbuk live project inspection report
What does this form include?
This form contains 32 sections:
Add media
What are the weather conditions at the time of inspection?
What is the temperature at the time of inspection?
What type of NBUK inspection is being carried out?
What is the approximate area of the roof sizes seen?
What percentage of work has been completed to date?
Which Nord Bitumi waterproofing system is specified on the project?
What is the length of the warranty to be applied for upon completion of the project?
DECK: SUBSTRATE: PRIMER: VAPOUR CONTROL / BARRIER: PU ADHESIVE: INSULATION / MM: 1ST LAYER: INTERMEDIATE LAYER: CAP SHEET:
ROLLS MUST BE STORED IN A VERTICAL POSITION AND STORED AT A TEMPERATURE OF NOT LESS THAN 5 DEGREES CE
MATERIALS & STORAGE
- Are the materials being stored correctly (undamaged) and safely?
TOOLS & EQUIPMENT
- Are there the correct tools and equipment on site?
SUBSTRATE
- Are all areas to receive new waterproofing secure (fully cohesive), clean, dry, even (level) and smooth?
THE INTEGRITY OF WATERPROOFING DEPENDS ON PROPER OVERLAPPING OF MEMBRANE AND STAGGERING OF LAPS.NORDC
QUALITY OF LAP SEALING AND BITUMEN BEADING TO FLAT AREA
- Does the quality of lap sealing and bitumen beading achieve Nord Cover conformity?
ACCOUNT SHOULD BE TAKEN OF THE REQUIREMENT TO LAP SUCCESSIVE LAYERS, THE DIRECTION OF FALL AND ANY PH
QUALITY OF SETTING OUT OF ROOF SHEET TO FLAT AREA.
- Does the quality of setting out of roof sheet to the flat area achieve Nord Cover conformity?
PLEASE NOTE; TO ADDRESS INCLEMENT WEATHER & RISK OF DRIVING RAIN BS:6229:2003 RECOMENDS THAT FLAT ROO
Upstands
- Upstands
- Thresholds/cills
- Cover flashings
- Parapets
- Edge details
- Rainwater outlets
- Pipe penetrations
- Change in level detailing
- Rooflights
- Additional surfacing
It should be noted that minor ponding is likely to occur. BS 6229:2003 anticipates the inevitability
Is there evidence of ponding?
- Is there evidence of ponding?
If yes, does the extent achieve Nord Cover conformity?
- If yes, does the extent achieve Nord Cover conformity?
BS 8217 2005 states that with slopes 5-25 degrees, the mechanical fastening/nailing of new waterproof
Are mechanical fixings (if applicable) correctly installed in accordance with wind loading calculations provided by Nord Bitumi?
- Are mechanical fixings (if applicable) correctly installed in accordance with wind loading calculations provided by Nord Bitumi?
TYPICAL ISSUES INCLUDE;Other trades not respecting areas of completed waterproofing and continuing to
Are other trades respecting areas of completed waterproofing?
- Are other trades respecting areas of completed waterproofing?
- Has the installation been interrupted by other trades / site program?
- Is there evidence of sharps, fines, contamination or spills?
- Is there evidence of third party cabling, fixings or equipment?
Is cleanliness in accordance with Nord Bitumi standards?
- Is cleanliness in accordance with Nord Bitumi standards?
ELECTRONIC LEAK DETECTION TEST
- Independant electronic leak detection test recommended?
COMPLY WITH WARRANTY?
- Does the current installation achieve Nord Cover conformity?Please note if this inspection relates to an Initial or Progress inspection then Nord Cover conformity can not be achieved.
IS ANOTHER VISIT REQUIRED, IF SO ON WHAT APPROXIMATE DATE?
- Is another visit required, if so on what approximate date?
NORD BITUMI UK LTD F2 & F3 RAILWAY TRIANGLE WALTON ROAD FARLINGTON PORTSMOUTH HAMPSHIRE, PO6 1TG
Use this template