Pdi report checklist
Large vessel production
What does this form include?
This form contains 11 sections:
Vessel
- Outer Vessel Condition
- Outer Vessel Paintwork
- Outer Vessel Welding
Frame
- Frame Condition
- Frame Paintwork
- Frame Welding
- Forklift Pockets
- Roof Plates
Sling Number
Pipework
- Condition
- Drip Trays
- Relief Valves
- Valves
- End Caps
Add media
Data Plates
- ADR / RID / IMO
- DNV / EN
- CSC
- ASME
- PED
Decals
- Regulations
- Max Gross Weight
- Tare Weight
- Capacity
- Schematic
- Filling Ratio
- Asset Number
Other
- Cabinet
- Manway
- Rubber Lining Outer Vessel
Inspection By
Faults Acknowledged By
Re-Work Inspected By
Use this template