Mobile crane jobsite inspection checklist
General contractor
What does this form include?
This form contains 17 sections:
Crane has adequate access around site?
- Crane has adequate access around site?
- Jobsite provided with adequate material staging area?
- Adequate room for crane assembly/disassembly?
Weather Conditions
Pre-planning meeting conducted before assembly/disassembly?
- Pre-planning meeting conducted before assembly/disassembly?
- Qualified person supervised assembly/disassembly?
- Crane selected is appropriate for load capacity and reach?
- Crane operator training verified?
- Crane's annual inspection available?
- Crane setup on stable surface - Compacted soils, Drained, Firm?
- Outriggers extended - Wheels off ground?
- Blocking/Cribbing adequate size (Size = 3x float size)?
- Crane setup level?
- Swing radius barricaded to prevent access - employee training?
- Lift route planned to prevent worker exposure to falling loads?
Work Zone Defined
Marked boundary
- Marked boundary
- or 360 max radius
Crane could get within 20' of powerline?
- Crane could get within 20' of powerline?
or Distance per table
Powerline voltage
Distance
Letter or notification from power company verifying powerline voltage received?
- Letter or notification from power company verifying powerline voltage received?
Safety Measures In Place
Pre-Planning meeting
- Pre-Planning meeting
- Non-Conductive tag lines in place?
- Elevate warning lines, or
- Barricades, plus
- A spotter, or
- Range limiter, or
- Warning device, or
- Insulating link?
- Employee training provided for powerline hazards?
- Qualified riggers present - Training verified?
- Rigging equipment appropriate for load to be lifted?
- Slings, spreader bars or chains checked for certifications?
- Rigging inspected?
- Qualified signal person present - training verified/documented?
- Hand signals posted at Jobsite?
- Daily Pre-lift meeting conducted?
- Competent person performed daily inspection and at each shift change?
- Competent person performing and documenting monthly inspection?
Crane suspended personnel platform in use?
- Crane suspended personnel platform in use?
If yes, has the design/use been verified - Trial run per 1926.14 conducted?
- If yes, has the design/use been verified - Trial run per 1926.14 conducted?
- Airport/Helipad locations nearby?
- Multiple crane use - Coordinate procedures
- Multiple crane use - Critical lift plan in place?
Safety Manager
Superintendent/Foreman
Crane Operator