Mchugh concrete pour quality control checklist
The following checklist must be completed before concrete placement on a deck, wall or column.
What does this form include?
This form contains 8 sections:
Post tension
- Are all post-tensioned cables accounted for with no shortages or extra cables?
- Are all cables extending at least 20" past the bulkhead so that they can be stressed?
- Do all tendons have sufficient space to be stressed?
- Have all castings been dressed up with back-up bars?
Add media
Rebar
- Are all additional bars installed around MEP openings/sleeves?
- Are all column (or beam) dowels sticking out of pour with sufficient lap splices?
Carpenters
- If the product is a wall or column, has the correct type of form with the appropriate finish been used?
- Are all construction joints in place with any necessary key-way and holes for steel dowels?
- Have all embeds/dovetail/barrier cable sleeves been installed?
- Have all formwork inserts been installed, i.e. cones, holemakers etc.?
- Do all beams, walls and columns have reveals/chamfer installed as designed?
- Do all balconies and edges have drip strips installed where needed?
- Have all beams been checked for hardware to prevent blow out? (Ties, jahn-a clamps, kickers, wing nuts, bulkheads etc.)
- Have all necessary spots been reshored according to the reshore drawing?
- Have all handrails been adjusted to remain 42" above the deck AFTER concrete is poured, and is toe board installed?
Engineer
- Has core and vertical formwork been plumbed before and after concrete is placed?
- Are all MEP openings, beam pockets and box outs installed and in the correct location?
- Have all embeds, stud rails and anchor bolts been installed according to the embed/stud rail/anchor bolt drawing?
- Has all grading of the deck been planned or completed, including cambers, column shortening, pitches and slopes?
- Have all new/changed walls or columns been laid out and shown to the Ironworker and Carpenter boss?
Finishers
- Are all slab slopes/pitches/high points and low points marked out and shown to the finisher foreman?
- Are the concrete conditions going to change with weather and % of accelerator?
- Is the finished product determined? (trowel, bull float, broom etc.)
- Are all water barrels and power trowels in place or lined up ready-to-go?
Laborers / Clean-up
- If there are different mixes being used, are all the puddling and different mix locations known?
- Have all scraps (2x4s, rebar, garbage) been picked up off the deck?
- Has deck been blown and vacuumed?
- Are all concrete pipes laid out with clamps secured?
- Has a form release agent been applied to the bottom of the beams and deck?
Add signature