Live electrical work - site risk assessment checklist
Hsg-ras-008-rev. 0::Ia
What does this form include?
This form contains 13 sections:
Customer liaison
- Will the customer allow the electrical supply to be isolated for the during of the work to be carried out? (therefore no live working required)
If 'Yes' agree approximate start time & duration of task
If 'No' and live working is necessary for the duration of the task, how long will the task take?
Where the risk assessment deems that live working is not appropriate and agreement cannot be reach ov
Acceptance from the customer that the machine is unavailable and the electrical supply cannot be isol
Customer signature
Position
A risk assessment must be completed for live electrical work. For any hazards which are not adequatel
Hazards, Panel condition, consider;
Risk assessment
- Exposed conductors?
- Damaged wires / panel?
- Water ingress?
- Sharp objects?
- Lint / dust?
Check surrounding area, consider;
Completion of risk assessment
- Is the risk acceptable to carry out work in live working?
- Is accompaniment required?
- Is escalation required?
Christeyns employee signature
Use this template