Jgi final inspection checklist for motors
Rebuild
What does this form include?
This form contains 3 sections:
Special Requirements:- PD dedicated K489 crowd motors: extra mount holes drilled for K408 mount plate.- motors shipping to Gillette inventory do not have attachments installed.- Baghdad motors get national brushes.
- Vibration data: Confirm that vibration data has been reviewed & approved.
- Has motor been blown out and all debris cleared?
- Check that a final commutator profile (TIR) has been completed.
- Check grease fittings, pipes, and relief's & verify red grease tags are installed.
- Check sheave, coupling nuts, lock washers,retaining plates and bolts as required.
- RTD connection instructions: Are they in the terminal box?
- Confirm coupling or sheave is touching outer slinger, unless slinger has set screw.
- Verify that the Job Acknowledgement information matches the nameplates.
- If CEP ( Encore) or PD dedicated, make sure all covers are on.
- Make sure pictures are taken before motor is wrapped in plastic.
- Verify the test run checklist is in the pouch and signed off.
- Is parts list in the job pouch (from warehouse/receiving area?
- Are all bolted connections tight?
- If motor is PD dedicated, have handles been painted YELLOW?
- Is prep & paint up to Mesa Joy Global quality standards?
- If crowd motor, has bottom cover on commutator end been removed?
- Check to see that the eye bolts at 12:00 position on K504T Motors do not touch the interpole coils.
- Dual purpose motors: Is packet attached to motor? (Example K408 crowd/propel; K1010 hoist/crowd ...)
- Have job number and country of origin been stamped in unit?
Megger and record the following readings: Armature circuit: Shunt field: Between circuit:
Inspector's name: