Hvac inspection checklist
Aurora mechanical ltd
What does this form include?
This form contains 22 sections:
Rooftop Units (RTU)/Make-Up Air Units (MUA)/Air Handling Units (AHU)
- Rooftop/Make-Up Air/Air Handling equipment inspected on this maintenance visit?
Split Systems (SS)
- Split System Equipment Inspected on this Visit?
Air Cooled Condenser Units (ACC)
- Air Cooled Condenser Units Inspected on this Visit?
Heat Pumps (HP)
- Water Source Heat Pumps Inspected on this visit?
Cooling Towers/Evaporative Condensers
- Cooling Towers Inspected on this Visit?
Exhaust Fans (EF)
- Exhaust Fan equipment inspected on this visit?
Radiant Heaters (RH)/Unit Heaters (UH)
- Radiant Heaters/Unit Heaters inspected on this maintenance visit?
Boilers (B)
- Were any boilers inspected on this inspection visit?
Hot Water Tanks (HWT)
- Are there any hot water tanks inspected on this maintenance inspection?
Preventative Maintenance Findings
- Are there any equipment issues discovered during this audit?
Equipment Tag/Make/Model No./Serial No.
Issue
Equipment Replacements/Additions
- Has any of the equipment covered under this maintenance agreement been replaced since the last inspection?
Equipment Type
New Equipment Make
New Equipment Model No.
New Equipment Serial No.
Replaces (previous equipment as noted on Schedule 'A')
Equipment Notes/Details (i.e. filter/belts sizes and quantities)
This maintenance inspection was completed as per
Service Technician Name
Inspection/Maintenance Labour Hours
Use this template