Factory acceptance test checklist
Use this factory acceptance test (fat) checklist to document the complete::Incomplete fat protocol, capture photo evidence of the entire fat procedure, including hazard identification, safety inspection and ergonomic assessment, specify the pass::Fail acceptance criteria upon the actual fat, assign corrective actions for equipment nonconformities and validate the factory acceptance test with digital signatures of the fat personnel.
Was enthält dieses Formular?
Dieses Formular enthält 13 Abschnitte:
Factory Acceptance Test Protocol
- Standard Work Procedures
- Certificates of Compliance
- Welding Processes Qualifications
- As-built Technical Drawings
- Instruments Calibration Certificates
- Equipment Data Sheets
- Materials Data Sheets
- Standard Maintenance Procedures
- Installation, Maintenance and Users’ Manuals
- Recommended Spare Parts Lists
- Training Materials
- FAT Procedure
Factory Acceptance Test Preparation
- Hazard Identification
- Safety Inspection
- Ergonomic Assessment
Factory Acceptance Test Personnel
- Were pre-tests conducted?
- Do the design engineers and fabrication manager agree that the equipment is ready for FAT?
- Are operators and maintenance personnel present?
- Is the client aware of the acceptance criteria?
- Are all FAT personnel equipped with the right PPE?
Factory Acceptance Test of Equipment
- Startup process
- Safety
- Control System
- User Interface
- Ergonomics
- Performance
- Shutdown process
- Maintenance
- Regulatory/Sanitary Design
- Conformance to Specifications
Post-Factory Acceptance Test Checklist
Additional observations
The equipment has been produced according to the specifications of the client. Since the equipment re
Full Name and Signature of Quality Manager
Full Name and Signature of Client Representative
Full Name and Signature of Head of Design Engineers
Full Name and Signature of Fabrication Manager
Full Name and Signature of Maintenance Coordinator
Full Name and Signature of Head Operator