Vroon vessel superintendent inspection 1 checklist

Template Information

Vessel superintendent inspection

Category: maritime

Template Questions

  • C.07 Report Completed / Part held.
  • C.08 What was the date of the last Superintendents Inspection? Date
  • C.09 What was the date of the last Internal Audit? Date
  • C.10 What was the date of the Last PSC? Date
  • C.11 What is the Masters Name and date of signing on?
  • C.12 What is the name of the Chief Engineer and date of signing on?
  • C.13 What is the name of the Chief Officer and date of signing on?
  • C.14 What is the name of the Second Engineer and date of signing on
  • Technical Superintendent Audit / Inspection (SIRE 5.3 - SIRE 5.6)
  • C.15 Crew Evaluations done and shared (Minimum for Master and Chief Engineer, state which rank and name
  • Last Dry Dock (IWS) Date Date
  • Next Dry Dock (IWS )Date Date
  • Last Hull Cleaning Date Date
  • 3.07 Open Conditions of Class (State which and due date) Date
  • 9.05 Are there any fuel related Problems?
  • 9.20 are there any lub oil related problems?
  • 8.05 Have engine performances been checked and discussed with the Chief Engineer?
  • 8.56 When is the next major overhaul of the main engines due? Date
  • 8.57 Which Major Spare Parts need to be purchased for main engineswithin the next twelve months?
  • 8.60 When is the next major overhaul for the auxiliary engines due? Date
  • 8.61 Which Major Spare Parts need to be purchased for auxiliary engine within the next twelve months?
  • 2.06 Percentage of Critical Maintenance overdue %
  • 2.07 Percentage of Maintenance overdue %
  • Areas and Spaces Inspected during this Survey.
  • I confirm that no item inspected during this audit requires immediate rectification prior to sailing or cargo operations.
  • Vessel Superintendent
  • Photographic Evidence.
  • Vessel Superintendent Inspection 1.01 - 1.35
  • 1.29 (SIRE 5.6) How many Near Misses have been reported in the last 30 days and how many thereof remain open?
  • 1.30 (SIRE 5.6) How many incidents have been reported in the last 30 days and how many thereof remain open?
  • 1.31.(SIRE 5.6) How many Accidents (LTI) have been reported in the last 30 days and how many thereof remain open?
  • 1.32 (SIRE 5.6) How many non conformities have been reported in the last 30 days and how many thereof remain open?
  • 1.33 Report any noteworthy incidents / accidents / non conformities here:
  • Photographic Evidence
  • Maintenance and Inventories
  • 2.06 Percentage of Critical Maintenance Overdue. %
  • 2.07 Percentage of Maintenance Overdue. %
  • General Remarks if any:
  • Certification
  • General Remarks:
  • Energy Efficiency:
  • Hull and Decks 41000
  • Date? Date
  • 4.14 General Remarks:
  • 4.15 Structural defects to be repaired during next technical stop or dry dock?
  • Cargo Equipment 43000
  • General remarks:
  • 5.20
  • 5.21
  • Gender all remarks if any:
  • Deck Cranes, Derricks and Booms
  • 5.40
  • 5.41
  • 5.42 General Remarks if any
  • Ship Equipment / Manoeuvring Equipment
  • General remarks if any:
  • Navigation Equipment
  • Communication Equipment
  • 6.50 Specification of mooring wires / rope including MMB, Certification onboard.
  • Anchoring and Mooring Equipment
  • 6.56 How many mooring ropes / wires will have to be purchased in the coming twelve months?
  • 6.65 when were the the anchor chain cables last calibrated and is any renewal expected during the next dry dock (and if so how many lengths)?
  • Lifesaving Equipment / Rescue Equipment / David Systems
  • 7.12 General remarks in required.
  • Accommodation / Galley and Sanitary Systems
  • Machinery Main Componants
  • 8.08 Why?
  • General remarks if any
  • Main Engine 2 Stroke
  • 8.23 Line wear in mm / unit 1
  • 8.24 Line wear in mm / unit 2
  • 8.25 Line wear in mm / unit 3
  • 8.26 Line wear in mm / unit 4
  • 8.27 Line wear in mm / unit 5
  • 8.28 Line wear in mm / unit 6
  • 8.29 Line wear in mm / unit 7
  • 8.30 Line wear in mm / unit 8
  • 8.31 Line wear rate per 1000 RH / unit 1
  • 8.32 Line wear rate per 1000 RH / unit 2
  • 8.33 Line wear rate per 1000 RH / unit 3
  • 8.34 Line wear rate per 1000 RH / unit 4
  • 8.35 Line wear rate per 1000 RH / unit 5
  • 8.36 Line wear rate per 1000 RH / unit 6
  • 8.37 Line wear rate per 1000 RH / unit 7
  • 8.38 Line wear rate per 1000 RH / unit 8
  • 8.39 Liner RH since last overhaul / unit 1
  • 8.40 Liner RH since last overhaul / unit 2
  • 8.41 Liner RH since last overhaul / unit 3
  • 8.42 Liner RH since last overhaul / unit 4
  • 8.43 Liner RH since last overhaul / unit 5
  • 8.44 Liner RH since last overhaul / unit 6
  • 8.45 Liner RH since last overhaul / unit 7
  • 8.46 Liner RH since last overhaul / unit 8
  • 8.47 Piston RH since last overhaul / unit 1
  • 8.48 Piston RH since last overhaul / unit 2
  • 8.49 Piston RH since last overhaul / unit 3
  • 8.50 Piston RH since last overhaul / unit 4
  • 8.51 Piston RH since last overhaul / unit 5
  • 8.52 Piston RH since last overhaul / unit 6
  • 8.53 Piston RH since last overhaul / unit 7
  • 8.54 Piston RH since last overhaul / unit 8
  • 8.55 Lube oil feed rate in g/kWh
  • 8.56 When is the next overhaul for the Main engine due? Date
  • 8.57 Which major spare parts need top be purchased purchased for the main engines within the next to 12 month?
  • Piston RH
  • 8.61 Which major spare parts need to be purchased for auxiliary engines within the next twelve months?
  • Main engine 4 Stroke
  • 8.70 When is the next major overhaul due for AE1 Date
  • 8.71 When is the next major overhaul due for AE2 Date
  • 8.72 When is the next major overhaul due for AE3 Date
  • 8.73 When is the next major overhaul due for AE4 Date
  • 8.74 When is the next major overhaul due for AE5 Date
  • 8.75 When is the next major overhaul due for AE6 Date
  • 8.76 Which major spare parts need to be purchased within the next 12 months?
  • Auxiliary Engines
  • Propellor, Shaft & Transmission
  • Boilers
  • Systems for Machinery Main Components
  • 9.20 Problems?
  • Lube Oil Systems
  • Add media
  • 9.30 Cooling Systems
  • 9.40 Condition?
  • 9.41 Condition?
  • 9.42 Condition?
  • Compressed Air Sysytems
  • Bilge and Oily Water Separator
  • When was the bilge alarm last tested and is it working satisfactorily? Date
  • Ballast Water System and Management
  • Fire detection and Fighting System
  • Electrical Systems
  • Fresh water Systems
  • Garbage and Waste Control
  • Inspection Report
  • Masters Signature
  • Inspectors Certificate