Welding process fusion welding (ac7110::5) checklist

Template Information

Audit criteria for fusion welding processes

Category: manufacturing

Template Questions

  • This audit is intended for use for internal audits at MSM. The criteria found within is largely based
  • 2.1 Welding ScopeProcesses performed at the facility (check appropriate boxes.
  • 2.0 General Instructions
  • 3.0 References
  • 4.0 Material Control
  • 5.0 Equipment
  • 6.1 Qualified Welding Schedules
  • 6.2 Deterioration of Welds
  • 6.3 Filler Material Control
  • 6.4 Weld Start and Run-Off Tabs
  • 6.5 Stress Relief
  • 6.6 Heat Treatment
  • 7.1 Cleaning
  • 7.2 Instructions
  • 7.3 Qualification Test Reports
  • 7.4 Multiple Pass Welds
  • 7.5 Subsequent Passes (Multiple Pass Welds)
  • 7.6 In-Process Corrections
  • 7.7 Rework Cycles
  • Welder/Welding Operators Certification SpecificationsDoes the facility performing welder / welding operator qualifications comply with AC7110/12?
  • 9.0 Inspection and Acceptance Criteria
  • 10.0 Periodic Maintenance
  • Customer/ Prime Contractor
  • Unique Work Order# or Lot#
  • Drawing #
  • Quantity
  • Part Name
  • Operation Sequence Number
  • Material Name
  • Material Specification
  • Thickness
  • Filler Material
  • Filler Material Specification
  • Gas
  • Welder/ Welding Operator
  • Welding Process
  • Customer Specification(s)/ Rev.
  • MIL/ Industry Specification/ Rev.
  • Class
  • Welding Requirements from purchase order, drawing, or specification
  • Pre-weld requirements- cleaning, preheat, prep, assembly on shop paper
  • Actual pre-weld conditions of parts observed at weld operation
  • 11.2 Welder / Welding Operator Qualification
  • 11.3 Authorization to Weld Production Hardware
  • 11.4 Certified Welding Schedule
  • 11.5 Use of Approved/Certified Welding Schedule
  • 11.6 Compliance with Customer Requirements
  • 11.7 Pre-Weld Preparation
  • 11.8 Compliance to Welding Schedule
  • 11.9 Rework
  • 11.10 Verification of Welding Requirements
  • 11.11 Weld Restrictions
  • 11.12 Process Approval
  • 11.13 Calibration
  • 11.14 Fixtures, Backing Materials, and Hold Down Bars
  • Supplement A- SMAW
  • Supplement B- SAW
  • Supplement C- Automatic/ Semi-automatic processes
  • Supplement D- Titanium Welding
  • This Supplement can be used for the following:a) In-Process Welding of Castings at Foundriesb) In-Pro
  • SUPPLEMENT E- FOUNDRY IN-PROCESS COMPLETION / REPAIR WELDING OF CASTINGS
  • E.1 Procedure Control
  • Supplement F- Filler Materials
  • Supplement G- Processes which use Gas
  • Supplement H- Preheat/ Interpass Temperature Control
  • Supplement I- STRESS RELIEVE HEAT TREATMENT (FURNACE & OVEN)
  • Supplement J- Tack Welding
  • Supplement K- Metallographic Evaluation of Qualification Welds
  • Supplement L- Bend Test Evaluation of Qualification Welds