Nadcap chemical processing checklist

Template Information

Process ac 7108

Category: manufacturing

Template Questions

  • Process
  • Customer
  • Part No
  • Description
  • Prime Contractor
  • Po/Rev Level
  • Part Quantity
  • Serial/Lot No
  • Alloy/Heat Treat Condition/Hardness
  • Processing Spec
  • other PO Requirements
  • 6.1.2 Paperwork review
  • Does the shop paper provide the following
  • List Equiptment
  • Recieving,paperwork generation, requirement review and Recieving inspection
  • Pre-process cleaning (Record pre cleaning method e.g vapour degrease or none required)
  • Pre-thermal operations (record time and temp or none required)
  • Masking (record masking type tape,wax, none required)
  • Fixuring/racking (record basket,hook,wire,tool)
  • Processing (record only if non compliant)
  • Post process cleaning (record method)
  • Post thermal operations (record time and temperature, time delay since processing, none required)
  • Final inspection
  • Packing and shipping (record method)
  • Solution and/or material testing( reviewed and acceptable, if material testing (paint) what was done
  • Periodic and/or lot testing (record testing done e.g lot, visual, thickness. Monthly - salt spray, coating weight etc)
  • 6.1.3 Process observations
  • 6.1.4 Lot acceptance testing/inspection
  • List the operators who preformed processing operations
  • 6.1.5 Operator control and job acceptance
  • Describe
  • 6.1.6 Certification and reports or test reports
  • Certificate or test report no (NA if certificate raised after audit completed)
  • Certification or test report date ( NA if cert not raised)
  • Auditee
  • Auditor
  • Report of Audit findings
  • List findings
  • Evidence submitted 1
  • Evidence submitted 2
  • Evidence submitted 3
  • Evidence submitted 4
  • Evidence submitted 5
  • Evidence submitted 6