Template Information
To witness and record the integrity of condensate drainage systems on refrigerated display case installations
Category: manufacturing
Template Questions
- Run details:
- Run description and installation type (i.e 38ft Brooklands back/back island, 16ft Produce wall run, etc)
- Number of cases
- Photograph the run (pipework, all pumps/drain up stands, all rodding eyes, etc)
- Condensate Drainage Checks
- Record how many rodding eyes have been fitted to the system for this run
- LIFT THE END MOST CABINET BASE PLATE FOR EACH CABINET AND POUR A BUCKET OF WATER INTO THE DRAIN SPIGO
- Condensate Drainage Acceptance for Run
- Run Drainage integrity checked for the GB/Epta by:
- Run Drainage integrity accepted for the client by: