Acceptance testing checklist

Template Information

Equipment runoffs, inspections, testing and sign-offs

Category: manufacturing

Template Questions

  • Pre-Audit Questions
  • All set points are available for initial trials?
  • Risk Assessment
  • What chemicals are needed with this equipment?
  • EH & S
  • What are the personal tasks for the required for the equipment?
  • What is the noise level with the equipment started up (idle)?
  • What is the noise level while the equipment is running?
  • Safety System
  • Number of emergency stop buttons?
  • Operations
  • What are the daily checks for operations?
  • What are the weekly checks for operations?
  • What are the monthly checks for operations?
  • What are the operating procedures needed?
  • What are the focal point procedures needed?
  • Any operational maintenance procedures?
  • General equipment pictures.
  • Equipment Run
  • What are the final set points in the machine?
  • Any other comments about the equipment run?
  • Maintenance
  • What is the serial number?
  • What is the make and model?
  • Any additional name plate information?
  • What are the setup tasks?
  • Setup
  • Obtain pictures of all lift point, slots for fork truck, all connection points, etc.
  • Wrap Up Questions
  • Start Up Team
  • Manufacturing Representative
  • Project Engineer
  • Technology Center
  • Process Automation