8d report checklist

Template Information

Corrective actions request

Category: manufacturing

Template Questions

  • Issuer
  • Issuer Email
  • Supplier
  • Addressee of the 8D
  • Addressee Email
  • Location of the Supplier
  • Part Number
  • Part Description
  • Supplier Part Number
  • Serial Number
  • Order Number
  • Delivery Number
  • What action was taken when the discontinuity was discovered?
  • Name
  • Departement
  • What is the problem?
  • Add media
  • Why is it a problem?
  • When was the problem discovered? Date
  • By whom was the problem discovered?
  • Description of the problem
  • Which products are affected?
  • What were the containment actions (within 24h)?
  • Select date Date
  • Isolation of potential faulty products
  • Indicate date of shipment Date
  • Delivery of fault-free products
  • Product serial number
  • Delivery of fault-free products
  • Other possible impacts of the problem
  • Cause(s)
  • Corrected Action(s) Retained
  • Corrective action(s) retained.
  • What is the planned implementation date? Date
  • By whom?
  • Serial number?
  • Batch number?
  • Indicate which controls (with records) have been put into place to verify the efficiency of the corrective action
  • Date Date
  • Describe specific preventive actions
  • Implementation date Date
  • Preventive Action(s) to Prevent Recurrence of the Problem
  • Delivery number
  • Preventive Action(s) to Prevent Recurrence of the Problem
  • Validation of the Answer & Implementation and Effectiveness Verification
  • Who verified the implementation?
  • Comments
  • Who performed the efficiency check?
  • Who closed the 8D report?
  • General comments (or other documents to close)