Gemba walk checklist
Use this gemba walk checklist for managers and supervisors to grasp the condition of the work place. a gemba walk is a kaizen lean manufacturing practice of always going to the source of the problem so as to grasp the real issues and verify facts. the gemba walk should not take more than thirty minutes with focus on the following key points: 1. check the seven wastes, 2. follow the flow from end of the process to the beginning, 3. check the four ms of man, machine, materials and methods, 4. check for abnormal conditions and 5. check for availability of standards.
What does this form include?
This form contains 6 sections:
Are people waiting for materials or are materials waiting for people at the workstations?
- Are people waiting for materials or are materials waiting for people at the workstations?
- Are there in-process storage areas to minimize movement?
- Is there too much inventory in the storage areas?
- Do workers appear to be making unnecessary movements in their work
- Are workers producing as per order?
- Are products staying longer in process than the prescribed time?
- Is there presence of defective products?
Is the flow of materials evident?
- Is the flow of materials evident?
Are workstations manned?
- Are workstations manned?
- Are there any machine breakdowns?
- Are people following standards?
- Are materials available?
Are there any abnormal conditions such as leaks, breakages and dirt?
- Are there any abnormal conditions such as leaks, breakages and dirt?
Are standards up to date?
- Are standards up to date?
- Are standards present?
Signed by manager