Ufb connect - faulty network billing 5 checklist

Template Information

Category: ict

Template Questions

  • Has all trouble shooting been completed as per ND0563 v2.4 before excavating?
  • Terminal ID / Service enclosure ID where Faulty Network claim has originated from
  • Faulty Network Category
  • Faulty Network Code
  • Number of Technicians on site
  • Total time for testing, locating, excavation & repair per technician in hours
  • Total time for closure of excavations, & soft / temp reinstatement per technician in hours
  • Total time for quality control, iAuditor, FPA, RONS, Asbuilts, CNA & HSE per technician in hours
  • Total time on site claimed per technician in hours
  • Breakdown of materials used, e.g. 100m ruggedize, 2x bags top soil
  • Total cost of materials used