Template Information
Category: ict
Template Questions
- Has all trouble shooting been completed as per ND0563 v2.4 before excavating?
- Terminal ID / Service enclosure ID where Faulty Network claim has originated from
- Faulty Network Category
- Faulty Network Code
- Number of Technicians on site
- Total time for testing, locating, excavation & repair per technician in hours
- Total time for closure of excavations, & soft / temp reinstatement per technician in hours
- Total time for quality control, iAuditor, FPA, RONS, Asbuilts, CNA & HSE per technician in hours
- Total time on site claimed per technician in hours
- Breakdown of materials used, e.g. 100m ruggedize, 2x bags top soil
- Total cost of materials used