Template Information
2009 infocomm commissioning tests
Category: ict
Template Questions
- INSTRUCTIONS1. Please answer the questions below. 2. Add Photos in ""Images"" and Comments in ""Notes
- I AV-PH: Physical Installation
- II AV-CM: Cable Management, Termination and Labeling
- III AV-E: Electrical
- IV AV-S: Serviceability
- All audio performance tests are made from all electronic system inputs (first physical output of sour
- V AV-A: Audio Performance
- All video performance tests are made from all electronic system inputs (first physical output of sour
- VI AV-V: Video Performance
- VII AV-N / AV-C: Control, Software and Networking
- VIII AV-AC: Acoustical Environment
- IX AV-DR: Verification and Documentation