Template Information
Qc field signoff
Category: general
Template Questions
- Confirm all leveling nuts and are placed (within footprint of base plate) and at correct elevation.
- All steel erected per shop drawings.
- Columns plumbed and structure erected within AISC tolerances.
- Visual inspection of all TC bolts snapped.
- Visual inspection of all hex bolts marked for "turn-of-the-nut".
- Finger-tight connections inspected and verified double-nut or damaged threads.
- Inspection of all washers and heavy-duty washers at oversized and slotted holes.
- Confirm all bolt holes are filled.
- All field welds visually inspected, accepted, and initialed. Document on daily reports.
- Plumb columns to within AISC tolerances.
- Snug up leveling nuts and shim plates, torque column anchor bolts, and weld plate washers in place. Pound in/out shim plates projecting outside of baseplate.
- All deck installed per shop drawings.
- All closures installed.
- Deck attachments and side lap fasteners installed per shop drawings.
- Studs installed per shop drawings.
- Ceramic ferrules broken.
- Bent plate installed and welded per shop drawings.
- Holes in deck foamed and/or closed.
- All tools, materials, and debris removed from deck.
- Deck signed off for safety. Safety cable installed/tightened, holes covered/marked etc...
- Random sample verification of IWF sign-offs above. (10% of all welds and connections).
- Erection and detailing inspected and signed off by 3rd party inspector.
- Decking and studs inspected and signed off by 3rd party inspector.
- All RFI's, FW's, and supplemental info pertaining to this area complete and inspected.