Template Information
Form to be completed by sat::Dat engineer before starting a sat::Dat job type
Category: general
Template Questions
- Job Number
- Job Type
- Select date Date
- Engineers on site
- Is this a true SAT job?
- If it is not SAT it is...
- Access to hight will be by:
- The following information constitutes an on-site risk assessment for the job. A Method Statement is also required.
- Additions to or variations from standard control measures. Any other relevant information- Please specify clearly.
- Which (if any) ladders are to be used? Select all required. NOTE: All PPE and ladder hierarchy should
- If LM or ML cannot be used, state what alternative is to be used. An eyebolt or other attachment point must be used for all dish installs and all service work.
- If anchor points are needed for Roped Access are they:
- Can the following Hazards identified be removed. If hazard is not present select N/A
- On-site identified hazards.
- Additional Hazard information
- If Hazards cannot be controlled or minimised then they must be escalated (give details below)
- A clear and detailed method for carrying out the work must be recorded here before the work commences. Items to be covered include site details, pre job preparation, roof type (flat/sloping(give apps angles)); rescue considerations (if standard rescue techniques say so, otherwise specify in detail). The method statement should have sufficient detail to allow another SAT team to understand how they would carry out the work. Add photos/draw diagrams as necessary to illustrate.
- Add media
- Both engineers must sign before work commences.
- SAT Engineer 1
- SAT Engineer 2