Template Information
Home service and supply
Category: general
Template Questions
- The following information constitutes an on-site assessment for the job. A Method Statement is also r
- 2. Access to height will be by:
- If Other Specify minimum control measures required.
- If Additions to or Variations from standard control measures - please specify clearly here.
- 3. Type of ladder to be used: (if applicable)
- 8-rung Ladder Standard Control Measure Requirements (as per Ladder Hierarchy) PPE Microlite + Eyebolt necessary to ensure security.
- If a LM or ML cannot be used please state here what alternative is to be used, an Eyebolt or other attachment point must be used for all dish installs and all service work.
- 4. If anchor points are needed for Roped Access are they :
- 5. On-Site Identified Hazards
- Is hazard present and can it be removed? (Y or N)
- Adverser Weather
- Third Parties
- Please state here what other hazards are if any?
- If hazards cannot be removed then they must be controlled or minimised. (Explain how)
- Can hazard be controlled or minimised? (Y or N)
- If hazards cannot be removed then they must be escalated . (Give detail)
- 6. Method Statement A clear and detailed method for carrying out the work must be recorded here before the work commences. Additional pages should be added as necessary. Items to be covered include site details; pre-job preparation; type of job (install, service, etc) roof type ( flat, sloping (give approx angle)); rescue considerations ( if standard rescue techniques say so, otherwise specify in detail). the method statement should have sufficient detail to allow another SAT team to understand how they would carry out the work. Draw diagrams if necessary to illustrate. Please write clearly.
- Pictures (if required)
- 1st Engineer Signature
- 2nd Engineer Signature