Template Information
Category: general
Template Questions
- Time of Audit Date
- Sunrise Meeting
- Standard Work Check
- Take a photo of the change board
- Indicate the changes in the area (man, method, machine, material)
- What is the top potential negative effects of the changes?
- Jets Line Assembly Audit
- Productivity
- State reason for WIP
- Safety
- 5S Condition
- Quality
- Machine Shop Area Audit
- 5S and Safety
- Indicate changes in the area (man, method, machine, material)
- LES Assembly Audit
- Production Supervisor: I have completed this Standard Work to the best of my ability
- Signed: