Odeon - server cabinet installation checklist

Template Information

V.1.4

Category: general

Template Questions

  • Has the new server cabinet and equipment been delivered?
  • Have you located the existing network cabinet?
  • Have you located the existing Fuse board for the new power supplys to be terminated on?
  • Odeon Helpdesk - 0330 123 0070. Or 07842 744432Or email - servicedesk@odeonuk.com
  • Have you called Odeon Helpdesk to confirm works are ok to commence ?
  • Have you put the new server cabinet in location?
  • Has a new clean earth been installed to cabinet
  • Have you installed / Rack mounted all the equipment supplied i.e. Server, UPS, PDU etc.
  • Have you installed new cat6 outlets for direct patches
  • Did the existing frame need to be replaced with a new cabinet
  • Have all required works been completed ?
  • Have you called Odeon Helpdesk upon completion of works
  • Engineers Comments:
  • Engineers signature
  • Were the engineers Polite and Courteous ?
  • I hereby confirm that there were no issues when the engineers left the store and that all works were completed: