Nadcap chemical processing - paint process ac 7108::1 rev b checklist

Template Information

Nadcap chemical processing - paint process ac 7108::1 rev b

Category: general

Template Questions

  • 2.1 Painting / Dry Film Coatings
  • Other list:
  • 2.2 Application Methods
  • 2.3 Paint System Types
  • 2.4 Curing Methods
  • 3. Painting and Dry Film Coatings
  • 4.0 Lot and periodic testing for Paint and Dry Film Coatings
  • 6.0 Chemical Process Job Audit Of Painting / Dried Film Lubricant
  • 6.1.1 Job Identity - job audit of
  • 6.1.1.1 Part Description
  • 6.1.1.2 Part No
  • 6.1.1.3 Customer
  • 6.1.1.4 Prime Contractor
  • 6.1.1.5 Po/Rev Level
  • 6.1.1.6 Part Quantity
  • 6.1.1.7 Serial/Lot No
  • 6.1.1.8 Date of job / job number
  • 6.1.1.9 Alloy/Heat Treat Condition/Hardness
  • 6.1.1.10 Processing Spec
  • 6.1.1.11 other PO Requirements
  • 6.1.2 Paperwork review
  • 6.1.2.3 Does the shop paper provide the following?
  • 6.1.3.1 Recieving,paperwork generation, requirement review and Recieving inspection
  • 6.1.3.2 Pre-process cleaning (Record n/a if not required)
  • 6.1.3.3 Pre-thermal operations (record n/a if none required)
  • 6.1.3.4 Time limits between preparation and coating application (record time limits or none required)
  • 6.1.3.5 Re-processing due to exceeding time between surface preparation and painting performed per int procedure and according to customers spec? (record method or none if no rework observed)
  • 6.1.3.6 Masking (record n/a if none required)
  • 6.1.3 Process observations
  • 6.1.3.9 Processing (record n/a if none required)
  • 6.1.3.10 Post process cleaning (record n/a if none required)
  • 6.1.3.11 Post processing thermal operations (record n/a if none required)
  • 6.1.3.12 Final inspection
  • 6.1.3.13 Packing and shipping
  • 6.1.3.14 Solution and/or material testing
  • 6.1.3.15 Periodic and/or lot testing (record testing done e.g lot, visual, thickness. Monthly - salt spray, coating weight etc)
  • 6.1.4 Lot acceptance testing/inspection
  • 6.1.5.1 List the operators who preformed processing operations
  • 6.1.5 Operator control and job acceptance
  • Describe
  • 6.1.6 Certification and reports or test reports
  • 6.1.6.3 Certificate or test report no (NA if certificate raised after audit completed)
  • 6.1.6.4 Certificate or test report date Date
  • Report of Audit findings
  • Details :