Mmr::Silcar jsa:: as built checklist

Template Information

Job safety & environmental analysis

Category: general

Template Questions

  • Has a safe work method statement been developed?
  • If any hazards are not listed on the applicable SWMS, you must contact your supervisor!
  • Is the required safety equipment on-site:
  • PPE (safety boots, long pants, long sleeve shirt, high visibility shirt, safety glasses, hearing protection, work gloves, P2 rated dust mask)
  • Supervisor- Prior to signing, all employees must be aware of the risk involved in performing the task, aware of the control measures in place and are satisfied that all foreseeable risks have been controlled and documented.
  • ToW#
  • Add location Address
  • Job Information
  • NTU Serial #- press bottom right corner of text box!
  • PSU Serial #- press bottom right corner of text box!
  • PCD-PEP (m)
  • MPT-PCD (m)
  • Pit-PEP (m)
  • Pit-Pit (m)
  • Pole-UG- Transition (ea)
  • Total cable (m)
  • PCD (no)
  • Indoor NTD
  • Moulded cable
  • Wall mount
  • Indoor UPS Rev 'C'
  • Battery
  • Connector Serial #
  • Breakout (sq.m.)
  • Reinstatement (sq.m)
  • Pole-house (m)
  • Point of contact-PCD (m)
  • Additional spans
  • Comments
  • Notes
  • Lead-in cable not installed
  • C1-02-02-01-7.5MF- >80m route length external cable/ m
  • C1-02-02-02-7.5MF- Supply & install conduit >20m from P.E.P/ m
  • C1-02-02-05-7.5MF- Supply & install of conduit from pit to P.E.P/ m
  • C1-02-02-06-7.5MF- Supply & install of conduit in ROCK from pit to P.E.P/ m
  • C1-02-02-07-7.5MF- Installation of lead-in cable from AERIAL network to underground network at pole/ no. of pole risers
  • C1-02-02-09-7.5MF- Additional charge to install fusion splice
  • C2-02-01-01-7.5MF- >30m length for internal fibre cable/ m
  • PCD Location, PCD terminated, MPT labelled, NTU terminated, meter readings, pictures to support extras.