Iso 3834 welding surveillance (ctl-wsf-01) checklist

Template Information

Category: general

Template Questions

  • Contract Number
  • Client
  • Drawing Number
  • Applicable Welding Code
  • Name
  • Welder ID
  • Welder / Welding Operator
  • If the answer above is No, please include details
  • Please include details of the WPS pack being used, (e.g. code A, what is the revision number, etc)
  • Welding set number?
  • Please include photos of the welding set
  • Welding Equipment (before use)
  • Please include a photo of the calibration sticker
  • Consumable being used brand name and type?
  • Photo of consumable packet (if available)
  • Consumable size?
  • Welding Consumable
  • WPS number being used?
  • Weld number being performed?
  • Shielding / backing gas being used (Inc type and mixture)
  • Gas flow rate?
  • Weather protection being used?
  • Pre-heat temperature?
  • Interpass temperature
  • How is the welder measuring the Pre-heat and Interpass temperatures
  • Voltage?
  • Amperage?
  • Run out length / time? (mm/min)
  • Calculate the heat input from the above values (Amps x Volts x (0.6 or 0.8 or 1.0) / Travel Speed (mm/min) = Heat Input)
  • Heat Input calculation based on actual results recorded
  • If the answer above is No, please provide more information
  • Visually inspect the completed weld and add comments below
  • Photo of weld upon completion
  • Welding Equipment (After use)
  • If you have answered No to any of the above within this category please provide details
  • Equipment faults must be reported to the Welding Engineer or Quality Manager, equipment must be remov
  • Any comments from the Welder / Welding Operator?
  • Any final thoughts from the auditor? (Any actions required)
  • Print name of auditor
  • Auditor Signature
  • Date Audit Completed Date