Horizontal centrifugal pumps (both ends supported) checklist

Template Information

Use this pump maintenance checklist to periodically inspect horizontal centrifugal pumps on the 3rd month, 1st year, 2nd year. select the dropdown to prompt the corresponding set of items to check. this customized iauditor checklist can be further edited to suit the needs of your pump inspections.

Category: general

Template Questions

  • Select inspection period
  • Bearing lubricant (for water contamination and sediments)
  • Following items of Journal bearings :
  • a) High spot (High Spots shall be scrapped)
  • Comments
  • Inspector Name and Signature