Electronic interiors audio visual commissioning work sheet checklist

Template Information

Category: general

Template Questions

  • Add pictures - capture appropriate images of facility and project.
  • Site note.
  • 2. General Installation Overview
  • 3. Cabling
  • 4. Visual Presentation System
  • Brand / Model / Serial number
  • Brand / Model / Serial Number.
  • Installation location:
  • Brand / Model.
  • Installed location.
  • 5. Connection Plate
  • Installed location:
  • Signal / Connection type:
  • 6. Camera
  • Signal type:
  • Where is the Camera installed?
  • Brand / Model / Serial number.
  • Device type:
  • 7. Source Device
  • 8. Lectern
  • Brand / Model:
  • 9. Microphone
  • 10. DSP
  • (type only, not individual element)
  • 11. Speaker System
  • 12. Hearing Augmentation System
  • 13. Video Conference System
  • 14. Audio Conference System
  • 15. Capture Device
  • 16. Network
  • 17. Control System
  • 18. Control Panel
  • 19. Motion Sensor
  • 20. Reed Switch
  • 21. Room Linking
  • 22. Lighting
  • Rack pictures (take finish photo from front, rear and sides)
  • Rack location.
  • 23. Rack
  • 24. Fly Leads
  • 25. System Calibration
  • Capture RTA image for ambient noise, A-weighted, slow average.
  • Description
  • Impedance:
  • All speakers shall be connected in the same polarity, and speech reinforcement system shall be polari
  • Use continuous sweep signal at headroom level for this "Buzzes and Rattles" test.
  • Record the "house curve" before equalisation, as well as after the equaliser have been tuned, with an
  • 26. Operation
  • 27. Software
  • 28. Equipment Remote Controls
  • 29. User Manuals
  • 30. Audio Visual Schematics
  • Record all equipment not on schematic but present.
  • Record all equipment on schematic but not present, and why.
  • Has practical completion been met, what is the date PC is effective from? Date
  • Works To Do:
  • 31. Sign off
  • Comments:
  • Client sign off (if present for testing)
  • Select date Date
  • Commissioning of the system is complete, all defects have been rectified and is now ready for handover (Signed by Commissioning Engineer).
  • InfoComm, 2006, 'Basics of Audio and Visual Systems Design'Giddings, 1990, 'Audio Systems Design and