  • Is the installation complete?
  • Indicate Quantity Used (or required if installation not complete). Standard installation comprises th
  • K & K wall bracket (state stand off used/required)
  • 2 inch mast (state type and length)
  • 2 inch wall mount (state stand off used/required)
  • 2 inch NPR
  • Aerial - state type used
  • Mast head amp and PSU
  • WF 100 cable (m)
  • WF 125 cable (m)
  • Trunking left on site - state length (m)
  • Other (please state type and quantity)
  • Photographs are required from site and presented with sign-off.
  • Elevation of building
  • Aerial location
  • The external cable route
  • The external cable entry point
  • The internal cable route
  • Location where cable is terminated (eg in ceiling above proposed TV location)
  • TV location (where the TV will be installed)
  • Freeview working on meter
  • Any additional photos
  • I confirm the aerial location, cable route and point of entry are agreed
  • Client/Site Contact Name
  • Client/Site Contact Position
  • Client/Site Contact Signature
  • Engineer Name
  • Engineer signature