Boiler, steam system and steam user audit

Template Information

This audit tool has been developed to assist clients manage their plant for safety, efficiency and serviceability.

Category: general

Template Questions

  • Did the Auditor find the Boiler House secure?
  • Is the Boiler House functionally adequate?
  • Comment
  • Does the Boiler House provide a safe working environment?
  • Are noise levels acceptable, below exposure standard 85dB(a)?
  • Is there adequate ventilation for the Boiler's operation and safety and comfort of the operators?
  • Is there adequate and suitable fire fighting equipment available considering the fuel and hazard risks?
  • Does the Boiler House have adequate communications available, including outside call access to Emergency Services?
  • Does the Auditor consider that the Boiler House generally complies with AS3892?
  • Does the Auditor believe that the components in the steam plant have been well maintained and operated?
  • Does the Auditor consider that the Boiler complies with the relevant Australian Standards?
  • Are Safety Valve seals intact?
  • Are the Gauge Glasses well lit and visible for the operating position?
  • Is the Pressure Gauge of a suitable range for the Boiler Pressure?
  • Are the Blowdown Valves in a safe position for operation?
  • Is the Boiler fitted with two Feed Pumps?
  • Are Sootblowers fitted?
  • Are Air Heaters fitted?
  • Are the Draft Fans inspected at the time of Boiler Inspection?
  • Are Dampers, Ducting and Windbox checked regularly by the Operators to ensure correct operation, no leakages and appropriate operation?
  • Is a Firing Grate employed?
  • Is an Economiser employed?
  • Is the Stack and Duct Work regularly inspected?
  • Is there a system of instrument checking and calibration that covers all critical instruments on the boiler?
  • Is the incoming feed water tested?
  • What type of Water Treatment plant is installed?
  • Is the water in the feed tank heated?
  • Does the Steam Distribution System meet the requirements of AS4041 in the following:
  • Are Pressure Reducing Stations installed to good industry standards?
  • Are all Pressure Vessels connected to the Steam Distribution System registered? (If required)
  • Is there a suitable water treatment program in place for the boiler?
  • Pressure Vessels
  • Name the Pressure Vessel
  • Registered Number
  • Serial Number
  • What is the frequency of inspection?
  • Last Inspection Date
  • Is the history of each Pressure Vessel available including the Manufacturer's Data Sheet?
  • Are there consistent minimum safety standards available and enforced for the control of all work associated with steam equipment by both employee and contractors?
  • Is there an established formal, documented procedure for authorising and recording changes to the system (controls, flow arrangement, equipment etc.)?
  • Is Flue Gas tested regularly and the combustion system adjusted to provide efficient combustion?
  • Are all boiler attendants certified for the appropriate boilers?
  • Is the Boiler House inspected regularly (daily) by the Service Engineer?
  • Are Contractors used for work on the system?
  • Are there other pressure vessels on site?
  • General Comments
  • Auditor