Asbestos removal control plan checklist

Template Information

Arcp

Category: general

Template Questions

  • Document Date: Date
  • Document Prepared By:
  • Client Name:
  • Client Contact Info:
  • Removal Site Address: Address
  • Removalist Details
  • Notification
  • Identification
  • Work Area(s):
  • Condition of Material?
  • Quantity to be removed?
  • Planned Start Date: Date
  • Planned Completion Date: Date
  • Preparation
  • Identifying Hazards
  • Security, Signs and Barriers
  • Personal Protective Equipment (PPE)
  • The following TOOLS & EQUIPMENT to be used:
  • Select the material to be removed
  • - Wet wipe &/or HEPA vacuum all dust & debris within the removal area, including:- > framework > ceil
  • Additional measure:
  • - Tools to be decontaminated by wet or dry decontamination procedures- Re-usable tools to be: > tagge
  • - Remove any visible asbestos dust/debris from protective clothing using damp rags or HEPA vacuum- Ca
  • How will the waste be contained?
  • Waste Collection & Storage
  • When will asbestos waste be disposed of, that is?
  • Transport & Disposal of Asbestos Waste
  • AAC Representative
  • Nominated Supervisor