Unbonded post-tensioned slab pre-pour inspection checklist

Template Information

Pre-pour checklist per specifications

Category: construction

Template Questions

  • 1. Preparation
  • Date of drawings (Structural, PT, & Rebar):
  • Name of Engineer
  • Engr. Tel.#
  • 2. Formwork
  • Slab thickness:
  • Slab edge installed per drawing:
  • Dated:
  • Slab edge anticipated to shorten __" after stressing.
  • 3. Mild Steel Reinforcing
  • Cover required at top:
  • Cover required at bottom:
  • 4. Post-Tensioning
  • 5. Embedments
  • 5b. Conduit
  • 5b-2. Maximum approved size
  • 5b-3. Approved material
  • 5c. Plumbing and other blockouts:
  • 5c-2. Maximum approved size
  • 5e. Embeds Installed:
  • Drawing #s and Dates of embed drawings used:
  • 6. Blockouts & Closure Strips
  • 7. Other
  • Completed by: McHugh Concrete Team
  • Date Completed: Date