Template Information
Pre-pour checklist per specifications
Category: construction
Template Questions
- 1. Preparation
- Date of drawings (Structural, PT, & Rebar):
- Name of Engineer
- Engr. Tel.#
- 2. Formwork
- Slab thickness:
- Slab edge installed per drawing:
- Dated:
- Slab edge anticipated to shorten __" after stressing.
- 3. Mild Steel Reinforcing
- Cover required at top:
- Cover required at bottom:
- 4. Post-Tensioning
- 5. Embedments
- 5b. Conduit
- 5b-2. Maximum approved size
- 5b-3. Approved material
- 5c. Plumbing and other blockouts:
- 5c-2. Maximum approved size
- 5e. Embeds Installed:
- Drawing #s and Dates of embed drawings used:
- 6. Blockouts & Closure Strips
- 7. Other
- Completed by: McHugh Concrete Team
- Date Completed: Date