Temporary works checklist

Template Information

Temporary works sensible monitoring audit

Category: construction

Template Questions

  • Any H&S actions identified shall be entered onto Audit / Inspection Action Log and brought to the urg
  • 1) What are the management arrangements for temporary works for the duration of the project?(Procedures / Responsibilities / Design / Documentation etc.)
  • Comments:
  • Attach any images relevant to question 1 here.
  • 2) Has a Temporary Works Coordinator been formally appointed?
  • Attach any images relevant to question 2 here.
  • 3) What minimum requirements have been established for the TWC's and TWS's?(do the identify minimum requirements for competence experience, qualifications, knowledge & training)?
  • Attach any images relevant to question 3 here.
  • 4) Has a register of temporary works been established and is the register being maintained in accordance with the clients procedures?
  • Attach any images relevant to question 4 here.
  • 5) Are all temporary works being undertaken on site (including temporary electrical supplies offices, workshop and equipment etc) identified on the Temporary Works Register?
  • Attach any images relevant to question 5 here.
  • 6) Have all temporary works on the register been categorized to identify required level of controls?
  • Attach any images relevant to question 6 here.
  • 7) Has temporary works design been undertaken where specified on the register?
  • Attach any images relevant to question 7 here.
  • 8) Has the TW design been reviewed by a 3rd party (where required) and approved by the TWC?
  • Attach any images relevant to question 8 here.
  • 9) Do the RAMS for the works make reference to the TW design, plans and calculations (where applicable) to ensure correct implementation of the TW design?
  • Attach any images relevant to question 9 here.
  • 10) Has a temporary works supervisor been nominated for each area of work?
  • Attach any images relevant to question 10 here.
  • 11) Will regular temporary work inspections be undertaken as required by TWD / legislation and recorded?
  • Attach any images relevant to question 11 here.
  • 12) Are the temporary works being installed in accordance with the TWD (where applicable) and is a copy available at the workface?
  • Attach any images relevant to question 12 here.
  • 13) Is there a system in place for the review of temporary works for suitably following any change in condition i.e. excavations?
  • Attach any images relevant to question 13 here.
  • 14) Is there an inspection system for the monitoring of temporary works to confirm compliance?
  • Attach any images relevant to question 14 here.
  • Print Name:
  • Signature:
  • Project Manager Name:
  • Designation:
  • Select date Date