Template Information
On-site assessment
Category: construction
Template Questions
- Generic Risk
- Site Specific Risk
- On-Site Risk Identified
- Photo of Hazard
- Other Risk 1
- Other Risk 2
- Other Risk 3
- Type of Scaffold
- Method Statement - Scope of Work
- Design Drawing Reference Number
- Location of Scaffold
- Board Configuration
- Number of Lifts Boarded as per SANS 10085
- Bay Lengths
- Lift Heights
- Loading - This is not to be exceeded under any circumstances.
- All Scaffold to be erected to SANS 10085?
- Programme Start Date Date
- Site Agent - A. Horsley HSEC Manager - S. Jansen van VuurenSenior Foreman - T. Jordao
- Scaffolding tubing and couplers to be fit for use as prescribed by SANS 10085.All the above will be i
- Standard Equipment is:- Safety Footwear, Safety Helmet, Safety Harnesses, high visibility vests and g
- Work areas will be segregated by mean of physical barrier with signs designating such.Materials will
- The contractor will comply with Clients site emergency procedures.The contractor to supply on-site fi
- All Scaffolding materials will be removed from site upon completion of works.Any substances that are
- Users of scaffold are directly responsible for ensuring that the scaffold is only used for its intend
- Work Method / ProcedureErect tube and fitting Independent scaffolding as per SANS 10085 and site requ
- Monitoring and complianceWorking Foreman will ensure that this Method Statement is adhered to by mean
- I confirm that I have been instructed on the method of work, hazards and risks involved and the neces
- Handover ProcedureFollowing completion of the scaffold a suitably qualified inspector will carry out
- If contracted to do so, S&K will carry out statutory inspections in accordance with the Work at heigh
- Handover Procedure
- Add signature
- Select date Date