Scaffold risk assessment and method statement checklist

Template Information

On-site assessment

Category: construction

Template Questions

  • Generic Risk
  • Site Specific Risk
  • On-Site Risk Identified
  • Photo of Hazard
  • Other Risk 1
  • Other Risk 2
  • Other Risk 3
  • Type of Scaffold
  • Method Statement - Scope of Work
  • Design Drawing Reference Number
  • Location of Scaffold
  • Board Configuration
  • Number of Lifts Boarded as per SANS 10085
  • Bay Lengths
  • Lift Heights
  • Loading - This is not to be exceeded under any circumstances.
  • All Scaffold to be erected to SANS 10085?
  • Programme Start Date Date
  • Site Agent - A. Horsley HSEC Manager - S. Jansen van VuurenSenior Foreman - T. Jordao
  • Scaffolding tubing and couplers to be fit for use as prescribed by SANS 10085.All the above will be i
  • Standard Equipment is:- Safety Footwear, Safety Helmet, Safety Harnesses, high visibility vests and g
  • Work areas will be segregated by mean of physical barrier with signs designating such.Materials will
  • The contractor will comply with Clients site emergency procedures.The contractor to supply on-site fi
  • All Scaffolding materials will be removed from site upon completion of works.Any substances that are
  • Users of scaffold are directly responsible for ensuring that the scaffold is only used for its intend
  • Work Method / ProcedureErect tube and fitting Independent scaffolding as per SANS 10085 and site requ
  • Monitoring and complianceWorking Foreman will ensure that this Method Statement is adhered to by mean
  • I confirm that I have been instructed on the method of work, hazards and risks involved and the neces
  • Handover ProcedureFollowing completion of the scaffold a suitably qualified inspector will carry out
  • If contracted to do so, S&K will carry out statutory inspections in accordance with the Work at heigh
  • Handover Procedure
  • Add signature
  • Select date Date