Regulatory reform (fire safety) order 2005, fire risk assessment checklist

Template Information

University of essex

Category: construction

Template Questions

  • Departments/ sections occupying the building
  • Head(s) of Department/ Section
  • Number of Floors
  • Floor area: (m2 per floor)
  • Floor area: (m2 total)
  • Brief details of construction:
  • Occupancy type:
  • Maximum number of occupants:
  • Maximum number of occupants at any given time:
  • Maximum number of members of the public at one time:
  • 3 Occupants at special risk
  • 4 Previous Fire loss experience
  • 5 Other relevant background
  • 6 Electrical sources of ignition
  • 7 Smoking
  • 8 Arson
  • 9 Portable heaters and heating installation
  • 10 Cooking facilities
  • 11 Lightning
  • List other ignition sources:
  • 13 Housekeeping
  • 14 Hazards introduced by contractors and building works
  • 15 Dangerous Substances
  • 16 Means of escape
  • 17 Measures to limit fire spread and development.
  • 18 Escape lighting
  • 19 Fire safety signs and notices
  • 20 Means of giving warning in the event of fire
  • 21 Manual fire extinguishing appliances
  • Type of system:
  • Comments and observations:
  • Types of facilities:
  • Person responsible for fire safety:
  • 24 Procedures and arrangements
  • 25 Training and drills
  • 26 Testing and maintenance
  • Other relevant inspection and test
  • 27 Records
  • Item 1
  • Recommendations
  • Risk Items
  • Projected completion date Date
  • Date completed Date
  • Item 2
  • Item 3
  • Item 4
  • Item 5
  • Item 6
  • Item 7
  • Item 8
  • Item 9
  • Item 10
  • Pictures
  • Assessor Name
  • Report sent to:
  • Date emailed. Date
  • Date emailed Date
  • Recommended date for re-assessment Date