Template Information
Assessment workbook and marking guide
Category: construction
Template Questions
- If you are unhappy with the assessment process you are encouraged to talk through the issues with the
- Add media
- Date: Date
- Name:
- ID No.
- Company:
- Site Location:
- Type of Closure:
- Type of Work:
- Tick as required:
- CoPTTM Level 2/3 Practical Assessment
- Assessment Standard:Assessors should note that the TMP may not contain all the items listed above. Th
- The STMS should be satisfied that the TMP is complete and fit for the task in hand. Specific items th
- TMP Satisfactory
- Road Condition OK
- Assessment Standard:For competency the candidate must correctly carry out both the traffic volume ass
- Assessment Standard:Minor faults do occur and must be rectified asap. failure by STMS to notice a dev
- Comments:
- Are high visibility garments:
- Clothing/Personal Protection Equipment (PPE)
- Assessment Standard:For competency in personal safety the Candidate must remind crew of safety zones,
- Personal Safety:Have safety zones been clearly detailed for installation? i.e.
- Crew Duties
- Has the STMS directed crew to check (Personal protective Equipment)PPE to ensure that:
- Has the STMS briefed crew and have they signed the associated documentation on identified traffic rel
- Assessment Standard:For competency in “installation procedures, it is vital to the success of the clo
- Has the STMS explained:
- Installation Procedures:
- Does the briefing include details to cover the following contingencies:
- Contingency Plans:
- Assessment Standard:For competency in Contingency Plans the candidate must detail the likely continge
- Communication Systems
- Assessment Standard:For competency with communication systems the Candidates’ brief must cover each o
- Has the STMS ensured that all personnel, plant and materials are clear of all safety zones?
- Safety Zones
- Assessment Standard:Minor faults do occur and must be rectified asap. Allowance must be made for laps
- Are there sufficient stocks of all equipment to fulfil the TMP requirements and any contingency plans?
- Equipment Requirements
- Assessment Standard:For competency in Equipment Requirements the Candidate must hold a list of the eq
- EQUIPMENT USED FOR ASSESSMENT
- Assessment Standard:Ensure that the equipment is appropriate for the operation .If any equipment is n
- Staff on vehicles
- Assessment Standard:If staff remain on a vehicle exceeding 50kph then a NC should be considered.Any s
- Are conflicting permanent signs covered or otherwise obscured from the view of approaching road users
- Signs
- Assessment Standard:Minor faults do occur and are either rectified asap or picked up during the drive
- Placement of Signs:
- Are channelising systems positioned:
- Channelising Systems Cones etc
- Assessment Standard:Two minor faults are allowed before a NYC is awarded.Minor faults do occur and ar
- Are the TMAs lowered:
- Mobile Equipment
- Assessment Standard:Minor faults do occur and should be rectified asap. Allowance must be made for la
- Use of Mobile Closure Vehicles
- Assessment Standard.The layout should be as per the tool box and in line with COPTTM procedures.A NC
- Layout.
- Laying taper.
- Site Access and Exit
- Assessment Standard:Minor faults do occur and must be rectified asap, failure by STMS to notice a dev
- Standard of Equipment
- Do documents allow the recording of:
- Documentation
- Are records being maintained in a timely and complete manner?
- Assessment Standard:Assessor to give a NYC if the documentation has not been completed in accurate an
- Are they:
- Channelising systems must be:
- Delineation
- Equipment checked, e.g. attenuators, arrowboards, barriers:
- Other
- Assessment Standard:Fault Identification and Rectification during the first inspectionAssessors can m
- The Assessor should listen to the radio communication. The Candidate should be calling the majority o
- Leadership of STMS
- Personnel BehaviourAssessors should note the attitude of the crew, if they are fooling around and the Candidate does nothing to stop this, a NYC should be applied.
- Where an incident occurs:
- Incident Management
- The Assessor is to note whether the Candidate saw an incident arising and failed to act, or once an i
- The candidate covers the following in the briefing:
- Visitor Briefing:
- Access & Exit – explain the following
- Assessment Standard:STMS introduces himself, explains he is in charge and that this is a worksite und
- Verifier name:
- Signature:
- ASSESSMENT RESULT (Complete and attach to front of papers)
- Further work needed to pass this unit standard assessment:
- Related Media Files
- Competent
- Assessor Name:
- Assessor Signature:
- Not Yet Competent