Mcw061 install solar sop checklist

Template Information

Mcw061

Category: construction

Template Questions

  • Steel capped boots
  • Hi-vis clothing
  • Do you have all the PPE required?
  • Wet roofs - slips, trips, falls
  • Harness where appliciable
  • 1. Install solar rails – 90 hold down brackets2. Install all earth bonds3. Run cable through roof4.
  • Notes or other hazards identified:
  • Add media
  • I have reviewed this Standard Operating Procedure and agree with the hazards identified and agree to
  • Name of signee: