Ips coil tubing field inspection checklist

Template Information

Field audit with standards

Category: construction

Template Questions

  • 1.0-Pre-Job Safety Meeting
  • 2.0 Mandatory Safety Equipment
  • 3.0 Rig Up - General / Wellhead
  • 4.0 Rig Up (CT Unit)
  • 5.0 Rig Up (N2 Pump)
  • 6.0 Rig Up (Fluid Pump)
  • 7.0 Rig Up (Crane)
  • 8.0 Job Execution
  • 9.0 Outside Of Equipment.
  • 10.0 Post Job
  • Comments
  • PIC Signature
  • Auditors Signature