Template Information
Field audit with standards
Category: construction
Template Questions
- 1.0-Pre-Job Safety Meeting
- 2.0 Mandatory Safety Equipment
- 3.0 Rig Up - General / Wellhead
- 4.0 Rig Up (CT Unit)
- 5.0 Rig Up (N2 Pump)
- 6.0 Rig Up (Fluid Pump)
- 7.0 Rig Up (Crane)
- 8.0 Job Execution
- 9.0 Outside Of Equipment.
- 10.0 Post Job
- Comments
- PIC Signature
- Auditors Signature