Gas safe bristol & somerset boiler installation survey v1.2 checklist

Template Information

Category: construction

Template Questions

  • Existing Heating System Type
  • Existing Hot Water System Type
  • MAKE / MODEL / OUPUT information required below
  • Picture of existing Boiler required
  • Existing Flue Details
  • Picture of Flue terminal required
  • Existing Boiler Electrical Connections
  • Existing Gas Supply To Boiler
  • Existing Controls
  • Picture of heating controls
  • Specify proposed new Boiler Details below E.G TYPE / OUPUT
  • Specify the new Boiler location taking into account minimum clearance and cupboards or other site restrictions in close proximity
  • New Boiler Location
  • If YES Specify cupboard dimensions below (Height x Width x Depth)
  • New Boiler Electrical Requirements
  • New Boiler Flue Details
  • Proposed New Controls Package
  • How many TRV's are required?
  • New gas supply requirements
  • Condense pipe and termination point
  • New Hot Water Cylinder
  • Picture of hot water cylinder being replaced
  • New hot water cylinder size?
  • How many replacement radiators including towel rails are required?
  • Details of all replacement radiators required below (SIZE / TYPE / ROOM / POSITION IN ROOM)E.G 600 x
  • How many new TRV's are required?
  • How many Lock-shields with drain off point are required?
  • How many standard lock-shields are required?
  • Replacement Radiators
  • Making Good
  • Picture of external brick/wall face required
  • How many metres of 28mm tube is required?
  • Core Material List
  • How many metres of 15mm tube is required?
  • How many metres of 22mm tube is required?