Template Information
Category: construction
Template Questions
- Field Inspection of Curtain Wall
- Following are the normal procedures for field inspection of the curtain wall installation. These proc
- -Embeds are inspected by Project Superintendent during the initial framing of the slabs to make sure
- Any time during the installation there are questions that the superintendent feels that our in house
- Floor Number
- Embeds to be checked
- Date checked Date
- Add signature
- Steel and T-Anchors to be checked
- Curtain wall to be checked
- Glazing to be checked
- Insulation to be checked
- Field Interior Trim to be checked
- Feld Sealants and pull test by JAMCo and MFG
- Water test by JAMCo and contractor