Template Information
Pre start safety of excavator
Category: construction
Template Questions
- Date: Time: Date
- Rego
- Records hours reading
- If any of the following critical components are found to be defective the equipment is to be Locked a
- Critical Checks
- Fluid Levels
- Conditional Checks
- Operational Checks
- Excavator Shut Down
- Signed by operator