All persons involved in task must have this swms communicated to them prior to work commencing
Category: construction
Template Questions
- Business Name: 12 Cassam St Yeppoon Qld 4703
- Business Address: 12 Cassam Dt Yeppoon Qld 4703
- Business Contact: Narelle Jack
- ABN: 47139584053
- Phone No: 0749392000
- SWMS APPROVED BY: Grantley Jack (Employer/PCBU/Director/Owner)
- Date: Date
- Name and Signature of person responsible for ensuring compliance with SWMS:
- Person/s Responsible for Reviewing the SWMS:
- SWMS amendments must be approved by
- Name and Signature:
- ALL PERSONS INVOLVED IN TASK MUST HAVE THIS SWMS COMMUNICATED TO THEM PRIOR TO WORK COMMENCING:- Dail
- Workers to be consulted:
- Job Title:
- The builder or the organisation you are working for.
- Principal Contractor Company Name:
- Project Name:
- Job Address:
- Project Manager Name and Signature:
- Date SWMS provided to Principal Contractor: Date
- This SWMS covers general safety hazards and risks involved with new electrical installations.
- Document #: 10090
- This work activity involves the following "High Risk Construction Work"
- High Risk Construction Work
- Ensure all PPE meets relevant Australian Standards. Inspect and replace PPE as needed.
- Personal Protective Equipment (PPE)
- Potential Hazard
- Liaise with Principal Contractor to establish the following on-site systems and procedures are in pla
- · If working at heights above 2m and “in built’ edge protection is not in place or not sufficient ens
- - Ensure a Confined Space Entry Permit is issued, as required, if work involves a Confined Space. If
- If operating powered mobile plant e.g. excavator, skid steer etc., for this task, ensure there are se
- A ‘Buddy’ system must be utilised at all times when working alone. Ensure: · An emergency response pr
- Person responsible to implement control measures:
- Lack of training or the assessment of capability may lead to personal injury, property damage &/or en
- · Ensure all persons entering site have a General Construction Induction Card (white card)· All worke
- Check constantly for mobile plant and vehicle movement. Ensure:· Follow traffic management plan direc
- Assess conditions at site on arrival. Ensure:· Ensure site-specific induction is undertaken (include
- · Movement of material from the delivery point to the installation area usually represents the greate
- · Park working vehicle to avoid travelling across roads when delivery working equipment· If setting u
- · Ensure equipment is not placed in areas where they may be run over, damaged or exposed to water (un
- · All noisy construction work conducted within regulated hours ( see local council / EPA for details)
- Ensure current Material/Safety Data Sheets (M/SDS) are obtained for all hazardous chemicals/substance
- Ensure underground services have been identified and marked accurately for depth and position: · Cont
- · Ensure all trenches are minimum 650 mm deep· Ground workers (Refer to step 3 for controls - Contact
- Do not:· Assist machine by hand when in operation· Use tools (such as shovels) to help move dirt from
- When working on top of excavations: · Erect any barriers & signage necessary to keep others safe and
- Check if excavations will cause a hazard to others e.g. left open overnight. If potential public haza
- Cutting conduit to length. Ensure:· Use conduit cutters where possible· Sound surface and stable foot
- · Ensure hazard tape is laid above conduits when installed in an open-cut trench· NOTE: The marker ta
- Priming fluid and solvent cements. Ensure:· Use glues recommended by pipe manufacturer · Have applica
- · Ensure a Risk Assessment has been carried out (for any work within 3m of Energised Electrical Insta
- · Ensure point of attachment service brackets and their supports including private poles, supports, s
- Ensure point of attachment can be safely reached by a portable extension ladder:· All trip hazards /
- Ensure point of attachment placed to avoid, where practical, the crossing of driveways or other areas
- All electrical conductors and parts, including neutral & earthing conductors, shall be treated as ene
- Take extra care when working in areas of reduced mobility because of restriction of movement and the
- PPE must be applicable and specific to the site and task. At minimum wear:· Long sleeved cotton shirt
- · Fit “Out of Service Tags” to any incomplete work· Locks & Danger Tags to only be removed by compete
- Hazardous manual tasks - MSD
- · If required, assemble cabinets on ground level · Ensure persons do not work in awkward postures (su
- Barricading and signage is developed. Ensure:· Signs used to provide clear instruction on entry permi
- · Pre-inspect and use ladders as per manufacturers instructions· Avoid using metallic, wire-reinforce
- · Follow directions of use· Consult M/SDS for the product· Ensure adequate ventilation · Dispose of c
- · Use tools only for the purpose specified by the manufacturer· Maintain, pre-inspect and operate the
- Identify all hazards. Consider: · Ground/floor surface condition · Where ground surfaces may change l
- · Ensure equipment is as close to work area as possible· There is adequate space to carry out the act
- All electrically hard wired appliances & fixtures must be installed as per manufactures instruction:·
- When using laser levels, ensure all persons operating laser have been trained and are competent in th
- Testing Equipment: · Good condition and working (particularly, leads, probes, clips) · Clean, no crac
- Contact with electricity
- · All components to be tested after the installation and before being placed in operation · Perform p
- Have you identified any further hazards on the job site?
- What job step does this hazard relate to?
- Risk-Rating (IR) before control measures have been put in place
- Control measures used to reduce risk
- Risk-Rating (RR) after control measures have been put in place.
- · Site to be left in clean and tidy condition ready for handover. Builder / supervisor to be advised
- · Dispose of hazardous chemicals/sealants in an approved waste receptacle.
- · Ensure that no electrical appliances, light fittings, cables etc. have been damaged during installa
- · Clean debris and ensure off cuts are removed from area· Observe good personal hygiene including was
- · If acceptable, remove barricades, contact supervisor and return as agreed· Final visual inspection
- Emergency Response - CALL 000 IMMEDIATELY.
- If work is to be conducted on a construction site (or a site controlled by another Employer / PCBU) f
- Ensure workers have access to:· First aid kit/supplies · First Aid trained personnel familiar with Re
- Note: Retain only the legislation references applicable to your state of operation for this SWMS.
- Relevant Legislation:
- Codes of Practice
- AS/NZS 3000: (Wiring Rules)AS/NZS 3012 Electrical Installations – Construction and demolition sitesAS
- Reference Documents
- Training and Licences Required For Workers Undertaking This Task. Select those relevant
- Licence details
- Photo of relevant licences
- Plant/Tools/Equipment Required For The Job
- Make & Model
- Plant/macinery photo
- Supervisory arrangements for this task:
- Enter relevant information
- Details of Regulatory Permits / Licenses / Engineering Details / Certificates / Work Cover Approvals:
- Item Details
- Overall Risk Rating After Controls
- This SWMS has been developed in consultation and cooperation with employee/workers and relevant Emplo
- Employee/Worker Name and Signature:
- Job Role/Position
- Employer/PCBU/Supervisor:
- To ensure controls are implemented and monitored effectively:• Toolbox /pre-work meetings will be und
- Ensure all controls are reviewed as per the following:• If controls fail to reduce risk adequately• W
- Review Number
- Name & Initials
- Date Date